2650
|
Friday, August 09, 2024, 16:15 |
Frank Song | South Hot-Cell | Repair | TM3 | TiC#8 | electrical check/leak check | TM3 with replaced target TiC#8 has
been checked on SHC before moving to ITW.
Pls see attachment |
|
|
2656
|
Tuesday, August 13, 2024, 08:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#67 | electrical check/leak check | TM2 with new target Ta#67 had been
electric/leak checked before moving to ITE.
See attachment pls. |
|
|
2662
|
Friday, August 16, 2024, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#68 | electrical check/leak check | New target Ta#68 is installed on
TM4 and be leak/electric checked. Pls see
attachment. |
|
|
2677
|
Tuesday, September 10, 2024, 12:41 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | TiC#9 | electrical check/leak check | TM4 with new target TiC#9 Surface
installed in SHC was leak/electric checked
before moving to TCS. See attached pic pls. |
|
|
2721
|
Tuesday, November 26, 2024, 13:03 |
Frank Song | South Hot-Cell | Standard Operation | TM3 | UCx#47 | electrical check/leak check | An electrical check and leak check had
been done after new target UCx47 was installed
on TM3 in SHC. see attachment pls. |
|
|
2792
|
Thursday, April 24, 2025, 11:13 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#48 | electrical check/leak check | TM4 with new target UCx#48 installed
was E/L checked on the top of NHC, see attachment
uploaded with pls. |
|
|
2801
|
Tuesday, May 06, 2025, 14:40 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UC#49 | electrical check/leak check | TM2 with new target UC#49 installed
is E/L checked on the flange of NHC in TH.
see attachment for detail. |
|
|
2814
|
Tuesday, June 17, 2025, 12:59 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | C#5 | electrical check/leak check | TM4 with new target number C#5 installed
had been leak/electric checked on NHC flange
in TH. see pic attached with pls. |
|
|
2498
|
Tuesday, November 07, 2023, 13:42 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check with the spent target | TM4 with spent target Ta#65 was electrical
checked right after being moved to SHC. |
|
|
2711
|
Tuesday, November 05, 2024, 11:04 |
Frank Song | South Hot-Cell | Standard Operation | | TiC#9 | electrical check with the spent target | David made electrical check right
after TM4 is moved from ITW to SHC. see attachment
pls. |
|
|
1255
|
Tuesday, June 07, 2016, 11:42 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#47 | electrical check on TM4 with old Ta target at SHC. | I did an electrical check on TM4 with the
old target still installed. The number is
a little bit low on 500V mega check between |
 |
|
895
|
Wednesday, April 22, 2015, 11:05 |
David Wang | Conditioning Station | Standard Operation | TM1 | | electrical check on TM1 at CS under vacuum | I did an electrical check on TM1 at CS.
The resistance check:A-B 3.918m ohm, A-C
5.905m ohm,A-D 4.070m ohm,B-C5.462m ohm,B-D3.633m |
|
|
2596
|
Wednesday, May 22, 2024, 12:43 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | electrical check and leak check were done on TM4 UCx#45 target at SHC. | electrical check and leak check were done
on TM4 UCx#45 target at SHC. everything
is ok. See attachment |
|
|
2457
|
Tuesday, June 13, 2023, 11:49 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | electrical check and leak check | TM4 with new target SiC#45 installed
has been leak checked and electrical checked
on top of NHC. |
|
|
2165
|
Wednesday, November 18, 2020, 15:28 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Nb#6 | electrical check and HS leak check. | Everything looks good. A still short to
P before target installation. We will float
P,Q as before on module top. |
|
|
2362
|
Tuesday, September 06, 2022, 14:05 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check after disconnection | An electrical was done on the NHC
for TM2 with spent Target UCx#38 on |
|
|
2632
|
Thursday, July 04, 2024, 13:23 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#45 | electrical check on TM4 UCx#45 target at SHC after operation. | electrical check on TM4 UCx#45 target
at SHC after operation is done.
see attachment. |
|
|
2321
|
Wednesday, May 18, 2022, 13:52 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | UCx#37 | electrical check | The TM4 with installed target #UCx37
had been electric checked at SHC. PICs attached. |
  |
|
2484
|
Tuesday, August 29, 2023, 10:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#42 | electrical check | TM4 with spent target UCx#42
has been electric checked at NHCpost right
after transferred from ITE. |
|
|
2264
|
Wednesday, November 10, 2021, 08:29 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | UC#36 | electrical check | An electrical check of TM2 with target
UC#36 and no external connections was finished
at SHC. |
|