Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2596     Entry time: Wednesday, May 22, 2024, 12:43
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx#45 
Subject: electrical check and leak check were done on TM4 UCx#45 target at SHC. 

electrical check and leak check were done on TM4 UCx#45 target at SHC.  everything is ok. See attachment

helium pressure test on TM4 HS line at TCS is done.   No leak.

Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer.pdf  80 kB  | Show | Hide all
ELOG V2.9.2-2455