Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2165     Entry time: Wednesday, November 18, 2020, 15:28
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Nb#6 
Subject: electrical check and HS leak check. 

Everything looks good. A still short to P before target installation. We will float P,Q as before on module top.

Attachment 1: Screenshot_2020-11-18_Mail_-_David_Wang_-_Outlook.png  455 kB  | Show | Hide all
ELOG V2.9.2-2455