Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1255     Entry time: Tuesday, June 07, 2016, 11:42
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#47 
Subject: electrical check on TM4 with old Ta target at SHC. 

I did an electrical check on TM4 with the old target still installed. The number is a little bit low on 500V mega check between chassis and 60KVbias which is 146Mohm. Others are good.    See attachment

I wrote all OL to 0  in attachment 1 ohmmeter check. Please See attachment 2 for correction.

Attachment 1: electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf  119 kB  | Show | Hide all
Attachment 2: electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf  127 kB  Uploaded Tuesday, June 07, 2016, 18:03  | Show | Hide all
ELOG V2.9.2-2455