Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2632     Entry time: Thursday, July 04, 2024, 13:23
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx#45 
Subject: electrical check on TM4 UCx#45 target at SHC after operation.  

electrical check  on TM4 UCx#45 target at SHC after operation is done.   see attachment.

Attachment 1: Tm4_UCx_46_at_SHC_after_operatiom.pdf  56 kB  | Show | Hide all
ELOG V2.9.2-2455