  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  227   Tuesday, January 08, 2013, 08:48 Travis CaveSouth Hot-CellStandard OperationTM1TiC#3Electrical checkTM#1 with TiC #3 post beam. See attached
PDF for results.
 TiC#3_Elec_Check_Post_beam.PDF 
  228   Tuesday, January 08, 2013, 14:18 Travis CaveSouth Hot-CellStandard OperationTM1no targetElectrical checkTM#1 was electrically check with out a
target see attached PDF for results.
 TM#1_no_tgt_Jan_8_2013.PDF 
  233   Thursday, January 17, 2013, 10:06 chad fisherSouth Hot-CellStandard Operation  SiC Test Target for TM4/CSI have inserted the test target for TM4
and the CS into the hot cell.
I had some concerns about the condition
 16x 
  234   Thursday, January 17, 2013, 11:18 Travis CaveSouth Hot-CellStandard OperationTM4 module moveTM#4 has been moved from the SW silo to
the south hot cell, move went well.
  
  235   Friday, January 18, 2013, 09:10 Travis CaveSouth Hot-CellStandard OperationTM4CS Test Target #1Electrical checkElectrical check performed on the CS Test
Target #1 at the south hot cell. See PDF
for details.
 CS_Test_Target_#1_Elec_check.PDF 
  237   Friday, January 18, 2013, 11:17 David WangSouth Hot-CellStandard OperationTM4dummy targetTM4 heat shield circuit leak check with dummy target on.Chad and i did a leak check on TM4 heat
shield circuit with installed dummy target
at SHC today. The leak detector is pumped
  
  253   Wednesday, March 06, 2013, 12:50 Travis CaveSouth Hot-CellMaintenance  module moveITW EX1 have been moved back to the west
target station from the south hot cell.
  
  256   Tuesday, March 12, 2013, 09:18 chad fisherSouth Hot-CellRepairTM4 Ground Electrode LeakOn Monday, March 11 the containment box
was removed from TM4 and a vacuum leak check
preformed in an attempt to locate the leak
  
  257   Wednesday, March 13, 2013, 07:22 chad fisherSouth Hot-CellRepairTM4 Ground Electrode Leak / Inspection ResultsFurther attempts to localize the leak were
unsucessful. The circuit was pressurized
with 60 psi air and snoop solution was applied
 IMG_3449.JPGIMG_3450.JPGIMG_3451.JPGIMG_3452.JPGIMG_3454.JPG 
  258   Wednesday, March 13, 2013, 11:23 chad fisherSouth Hot-CellRepairTM4 Ground Electrode LeakThe containment box has been re-installed
and the window waterlines reconnected and
leak checked.
  
  262   Thursday, March 14, 2013, 07:09 David WangSouth Hot-CellStandard OperationTM4 TM4 electrical test at SHC after windown and containment box back.TM4 electrical test at SHC after windown
and containment box back is done. Everything
is fine. 
  
  263   Thursday, March 14, 2013, 07:18 David WangSouth Hot-CellStandard OperationTM4 TM4 window cooling line leak checkIt took a long time(more than 1 hour)  
to pump down the TM4 window  cooling
line during leak check time. The base leak
  
  278   Tuesday, March 26, 2013, 14:17 Travis CaveSouth Hot-CellStandard OperationTM4SiC#28 (RFQ Target)Electrical checkElectrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but
 TM4_SiC28_RFQ_SHC_ELEC_CHK.PDF 
  281   Wednesday, March 27, 2013, 12:08 David WangSouth Hot-CellStandard OperationTM4Sic LIS-RFQTM4 heat shield circuit leak check with SiC LIS-RFQ targetChad and I did the TM4 heat shield leak
check yesterday at SHC. The leak detector
was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4
  
  282   Tuesday, April 02, 2013, 10:07 chad fisherSouth Hot-CellStandard OperationTM1Ta#39Ta#39 inserted into hot cellTa#39 has been inserted into the hot cell
in preparation for TM1 target change.
  
  283   Wednesday, April 03, 2013, 10:59 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 has been moved from the south west
silo to the south hot cell, move went well.
  
  285   Wednesday, April 03, 2013, 13:28 chad fisherSouth Hot-CellStandard OperationTM1Ta#39Ta#39 installedTa#39 has been installed onto TM1.   
  286   Wednesday, April 03, 2013, 14:39 Travis CaveSouth Hot-CellStandard OperationTM1Ta#39Electrical checkElectrical check on TM#1 with Ta#39 installed
at the south hot cell. Target passed the
electrical checks, see attached pdf for details.
 TM1_Ta39_SHC_ELEC_CHK.PDF 
  287   Thursday, April 04, 2013, 11:06 Travis CaveSouth Hot-CellStandard OperationTM1Ta#39module moveTM#1 with Ta#39 has been moved from the
south hot cell to the conditioning station
move went well.
  
  297   Monday, April 15, 2013, 11:00 chad fisherSouth Hot-CellStandard OperationTM3 Items for TM3 dummy target installationNew gaskets and fasteners have been inserted
into the south hot cell in preparation for
installing the dummy target onto TM3 tomorrow.
  