Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 233     Entry time: Thursday, January 17, 2013, 10:06
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: SiC Test Target for TM4/CS 

I have inserted the test target for TM4 and the CS into the hot cell.

I had some concerns about the condition of the target which I have discussed with Pierre and he has cleared. Pictures are attached.

Attachment 1: IMG_0909[1].JPG  1.244 MB  | Show | Hide all
Attachment 2: IMG_0910[1].JPG  1.180 MB  | Show | Hide all
Attachment 3: IMG_0911[1].JPG  1.023 MB  | Show | Hide all
Attachment 4: IMG_0912[1].JPG  1.092 MB  | Show | Hide all
Attachment 5: IMG_0913[1].JPG  1.098 MB  | Show | Hide all
Attachment 6: IMG_0914[1].JPG  1.165 MB  | Show | Hide all
Attachment 7: IMG_0915[1].JPG  944 kB  | Show | Hide all
Attachment 8: IMG_0916[1].JPG  1.222 MB  | Show | Hide all
Attachment 9: IMG_0917[1].JPG  1.242 MB  | Show | Hide all
Attachment 10: IMG_0918[1].JPG  1.285 MB  | Show | Hide all
Attachment 11: IMG_0919[1].JPG  1.251 MB  | Show | Hide all
Attachment 12: IMG_0920[1].JPG  1.210 MB  | Show | Hide all
Attachment 13: IMG_0921[1].JPG  752 kB  | Show | Hide all
Attachment 14: IMG_0922[1].JPG  1002 kB  | Show | Hide all
Attachment 15: IMG_0923[1].JPG  943 kB  | Show | Hide all
Attachment 16: IMG_0924[1].JPG  993 kB  | Show | Hide all
ELOG V2.9.2-2455