227
|
Tuesday, January 08, 2013, 08:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TiC#3 | Electrical check | TM#1 with TiC #3 post beam. See attached
PDF for results. |
|
228
|
Tuesday, January 08, 2013, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Electrical check | TM#1 was electrically check with out a
target see attached PDF for results. |
|
233
|
Thursday, January 17, 2013, 10:06 |
chad fisher | South Hot-Cell | Standard Operation | | | SiC Test Target for TM4/CS | I have inserted the test target for TM4
and the CS into the hot cell.
I had some concerns about the condition |
16x |
234
|
Thursday, January 17, 2013, 11:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | | module move | TM#4 has been moved from the SW silo to
the south hot cell, move went well. |
|
235
|
Friday, January 18, 2013, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | CS Test Target #1 | Electrical check | Electrical check performed on the CS Test
Target #1 at the south hot cell. See PDF
for details. |
|
237
|
Friday, January 18, 2013, 11:17 |
David Wang | South Hot-Cell | Standard Operation | TM4 | dummy target | TM4 heat shield circuit leak check with dummy target on. | Chad and i did a leak check on TM4 heat
shield circuit with installed dummy target
at SHC today. The leak detector is pumped |
|
253
|
Wednesday, March 06, 2013, 12:50 |
Travis Cave | South Hot-Cell | Maintenance | | | module move | ITW EX1 have been moved back to the west
target station from the south hot cell. |
|
256
|
Tuesday, March 12, 2013, 09:18 |
chad fisher | South Hot-Cell | Repair | TM4 | | Ground Electrode Leak | On Monday, March 11 the containment box
was removed from TM4 and a vacuum leak check
preformed in an attempt to locate the leak |
|
257
|
Wednesday, March 13, 2013, 07:22 |
chad fisher | South Hot-Cell | Repair | TM4 | | Ground Electrode Leak / Inspection Results | Further attempts to localize the leak were
unsucessful. The circuit was pressurized
with 60 psi air and snoop solution was applied |
|
258
|
Wednesday, March 13, 2013, 11:23 |
chad fisher | South Hot-Cell | Repair | TM4 | | Ground Electrode Leak | The containment box has been re-installed
and the window waterlines reconnected and
leak checked. |
|
262
|
Thursday, March 14, 2013, 07:09 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 electrical test at SHC after windown and containment box back. | TM4 electrical test at SHC after windown
and containment box back is done. Everything
is fine. |
|
263
|
Thursday, March 14, 2013, 07:18 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 window cooling line leak check | It took a long time(more than 1 hour)
to pump down the TM4 window cooling
line during leak check time. The base leak |
|
278
|
Tuesday, March 26, 2013, 14:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#28 (RFQ Target) | Electrical check | Electrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but |
|
281
|
Wednesday, March 27, 2013, 12:08 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Sic LIS-RFQ | TM4 heat shield circuit leak check with SiC LIS-RFQ target | Chad and I did the TM4 heat shield leak
check yesterday at SHC. The leak detector
was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4 |
|
282
|
Tuesday, April 02, 2013, 10:07 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Ta#39 inserted into hot cell | Ta#39 has been inserted into the hot cell
in preparation for TM1 target change. |
|
283
|
Wednesday, April 03, 2013, 10:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south west
silo to the south hot cell, move went well. |
|
285
|
Wednesday, April 03, 2013, 13:28 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Ta#39 installed | Ta#39 has been installed onto TM1. |
|
286
|
Wednesday, April 03, 2013, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Electrical check | Electrical check on TM#1 with Ta#39 installed
at the south hot cell. Target passed the
electrical checks, see attached pdf for details. |
|
287
|
Thursday, April 04, 2013, 11:06 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#39 | module move | TM#1 with Ta#39 has been moved from the
south hot cell to the conditioning station
move went well. |
|
297
|
Monday, April 15, 2013, 11:00 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | | Items for TM3 dummy target installation | New gaskets and fasteners have been inserted
into the south hot cell in preparation for
installing the dummy target onto TM3 tomorrow. |
|