Entry  Tuesday, January 08, 2013, 08:48, Travis Cave, South Hot-Cell, Standard Operation, TM1, TiC#3, Electrical check TiC#3_Elec_Check_Post_beam.PDF
TM#1 with TiC #3 post beam. See attached PDF for results.
Entry  Tuesday, January 08, 2013, 14:18, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Electrical check TM#1_no_tgt_Jan_8_2013.PDF
TM#1 was electrically check with out a target see attached PDF for results.
Entry  Thursday, January 17, 2013, 10:06, chad fisher, South Hot-Cell, Standard Operation, , , SiC Test Target for TM4/CS 16x
I have inserted the test target for TM4 and the CS into the hot cell.
I had some concerns about the condition of the target which I have discussed with Pierre and he has cleared. Pictures are attached.
Entry  Thursday, January 17, 2013, 11:18, Travis Cave, South Hot-Cell, Standard Operation, TM4, , module move 
TM#4 has been moved from the SW silo to the south hot cell, move went well.
Entry  Friday, January 18, 2013, 09:10, Travis Cave, South Hot-Cell, Standard Operation, TM4, CS Test Target #1, Electrical check CS_Test_Target_#1_Elec_check.PDF
Electrical check performed on the CS Test Target #1 at the south hot cell. See PDF for details.
Entry  Friday, January 18, 2013, 11:17, David Wang, South Hot-Cell, Standard Operation, TM4, dummy target, TM4 heat shield circuit leak check with dummy target on. 
Chad and i did a leak check on TM4 heat shield circuit with installed dummy target at SHC today. The leak detector is pumped to 0.0xE-9atm.cc/sec.Chad
sprayed helium twice on each  VCR joints .There is no any response had been found on the leak detector during each 45 seconds waiting time. The TM4
heat shield circuit with dummy  target is leak tight so far.  
Entry  Wednesday, March 06, 2013, 12:50, Travis Cave, South Hot-Cell, Maintenance, , , module move 
ITW EX1 have been moved back to the west target station from the south hot cell.
Entry  Tuesday, March 12, 2013, 09:18, chad fisher, South Hot-Cell, Repair, TM4, , Ground Electrode Leak 
On Monday, March 11 the containment box was removed from TM4 and a vacuum leak check preformed in an attempt to locate the leak in the ground electrode
circuit.
Following Pierre's work plain helium was sprayed was the highest joint accessible towards the lowest.
Entry  Wednesday, March 13, 2013, 07:22, chad fisher, South Hot-Cell, Repair, TM4, , Ground Electrode Leak / Inspection Results IMG_3449.JPGIMG_3450.JPGIMG_3451.JPGIMG_3452.JPGIMG_3454.JPG
Further attempts to localize the leak were unsucessful. The circuit was pressurized with 60 psi air and snoop solution was applied to both the braze
joints and the mating surface between the two halfs of the water blocks. Unfortunately, no visible bubbles could be dectected.
This was reported to Grant and Pierre and it was decided to continue with removing one of the vcr gaskets from the optics cooling lines (on the
Entry  Wednesday, March 13, 2013, 11:23, chad fisher, South Hot-Cell, Repair, TM4, , Ground Electrode Leak 
The containment box has been re-installed and the window waterlines reconnected and leak checked.
The window lines did pass the leak check, however the leak dectoctor did not pump down past 5.8 x 10-9.
The front cover has also been reinstalled.
Entry  Thursday, March 14, 2013, 07:09, David Wang, South Hot-Cell, Standard Operation, TM4, , TM4 electrical test at SHC after windown and containment box back. 
TM4 electrical test at SHC after windown and containment box back is done. Everything is fine. 
Entry  Thursday, March 14, 2013, 07:18, David Wang, South Hot-Cell, Standard Operation, TM4, , TM4 window cooling line leak check 
It took a long time(more than 1 hour)   to pump down the TM4 window  cooling line during leak check time. The base leak rate could only be
pumped to 5.8xE-9 atm.cc/sec.Base pressure is 0.0xE-4 torr which is bottom reading. Chad and i did the leak check at this base leak rate .No leak had been
found. The window cooling line is leak tight at this stage. A pressure helium test will be fulfilled in conditioning station on this cooling line later.
Entry  Tuesday, March 26, 2013, 14:17, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#28 (RFQ Target), Electrical check TM4_SiC28_RFQ_SHC_ELEC_CHK.PDF
Electrical check of TM#4 SiC#28 (RFQ Target) has been completed. It passed the standard electrical checks for the target part, but the electrical check
for the RFQ part is suspect, see the attached PDF for the details.
Entry  Wednesday, March 27, 2013, 12:08, David Wang, South Hot-Cell, Standard Operation, TM4, Sic LIS-RFQ, TM4 heat shield circuit leak check with SiC LIS-RFQ target 
Chad and I did the TM4 heat shield leak check yesterday at SHC. The leak detector was pumped to 4.6 xE-9atm.cc/sec, and 0.0xE-4 torr after 1.5 hours
pumping. Chad sprayed helium twice on both VCR fittings. There is no response had been found during each 45 seconds waiting time. Since the module moved
to ITE directly,we didnt have helium pressure test this time. I  would say thee heat shield circuit is leak tight. so far.
Entry  Tuesday, April 02, 2013, 10:07, chad fisher, South Hot-Cell, Standard Operation, TM1, Ta#39, Ta#39 inserted into hot cell 
Ta#39 has been inserted into the hot cell in preparation for TM1 target change.
Entry  Wednesday, April 03, 2013, 10:59, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 
TM#1 has been moved from the south west silo to the south hot cell, move went well.
Entry  Wednesday, April 03, 2013, 13:28, chad fisher, South Hot-Cell, Standard Operation, TM1, Ta#39, Ta#39 installed 
Ta#39 has been installed onto TM1.
Entry  Wednesday, April 03, 2013, 14:39, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#39, Electrical check TM1_Ta39_SHC_ELEC_CHK.PDF
Electrical check on TM#1 with Ta#39 installed at the south hot cell. Target passed the electrical checks, see attached pdf for details.
Entry  Thursday, April 04, 2013, 11:06, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#39, module move 
TM#1 with Ta#39 has been moved from the south hot cell to the conditioning station move went well.
Entry  Monday, April 15, 2013, 11:00, chad fisher, South Hot-Cell, Standard Operation, TM3, , Items for TM3 dummy target installation 
New gaskets and fasteners have been inserted into the south hot cell in preparation for installing the dummy target onto TM3 tomorrow.