Entry  Tuesday, March 18, 2025, 13:54, David Wang, ITE, Standard Operation, , , ITE water signals interlock annual check 
ITE water signals interlock annual check is done today. all interlocks work . No issue. 
Entry  Thursday, March 20, 2025, 13:10, David Wang, Conditioning Station, Standard Operation, , , TCS water system filters annual replacement has been done. 
TCS water system filters annual replacement has been done. Plant group Dan Tower finished the job and updated the inspection tags . 
Entry  Tuesday, April 01, 2025, 09:47, Frank Song, North Hot-Cell, Repair, , , Two NHC light bulbs replacement Image_(3).jpgImage_(4).jpgImage_(5).jpgImage_(6).jpgImage_(7).jpg
2 broken lights of NHC were replaced in Target Hall. see pics attached.
Entry  Friday, April 04, 2025, 09:35, David Wang, Crane, Development, , , spent target pail and its lifting jigs load test  
Adam and I did  spent target pail and its lifting jigs load test this morning.  The load for full pail test is 263 lbs and for empty pail is
69 lbs. pail and all jigs passed the test. 
Entry  Friday, April 11, 2025, 13:34, chad fisher, North Hot-Cell, Repair, , , remote end 9342 installed 
On March 27 remote end 9342 was installed on the west position (right hand as viewed by operator) and arm 9**4 removed and moved to anteroom.
Previous to this installation, arm 9342 received tensioning of the elevation twist pulley block and tightening of the tong cable opening via the
tong cable drum. Tong opening was reduced to roughly 2" to achieve tension in the tong cable such that slack upon release of the system was reduced
Entry  Friday, April 11, 2025, 13:46, chad fisher, North Hot-Cell, Repair, , , Remote end 9**4 repair 
Tong cable on remote arm 9**4 has be relocated onto its pulleys and tong opening adjusted at the tong cable drum by changing the position of the tong
cable screws by two positions (tightened/closed) such that the air tool will fit in the tong and some of the slack in the tong system has been taking up.
An attempt was made to also adjust the elevation twist pulley block which would also aid in taking up slack in the tong system however, the elevation