2431
|
Friday, April 14, 2023, 10:01 |
Adam Newsome | Assembly/Bench Test | Repair | | | Assaying Turntable Repair | The spent target assaying turntable was
repaired. It was tested today with a load
exceeding the maximum it would need to handle |
|
2460
|
Tuesday, June 20, 2023, 12:37 |
Adam Newsome | Assembly/Bench Test | Development | | | Modifications to wire ropes for pails within existing F-308s | Based on a request from CNL (attached),
modifications were made to the wire ropes
protruding through the tops of F-308s to |
6x |
2549
|
Wednesday, March 13, 2024, 11:12 |
Keith C Ng | Assembly/Bench Test | Repair | TM3 | | optics tray for tm3 | Alignment notes attached for the optics
tray for the refurbished tm3 with the new
service and source tray. |
|
2719
|
Thursday, November 21, 2024, 14:11 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM4 | UCx#46 | shielding blocks transfer | Shielding blocks have been moved
from ITE to ITW and MAA is secured. |
|
2735
|
Monday, December 09, 2024, 13:10 |
Frank Song | 5 Shielding Blocks | Standard Operation | TM3 | UCx#47 | shielding blocks transfer | 5 Shielding Blocks have been transferred
from ITW to ITE. MAA is secured after moving. |
|
2740
|
Friday, January 03, 2025, 12:34 |
Frank Song | 5 Shielding Blocks | Maintenance | | UCx#47 | shielding blocks moving | Five shielding blocks are moved from
ITE to storage area ( one of them is sitting
on B2 as limit of room) for target stations |
|