Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 943     Entry time: Thursday, June 11, 2015, 13:43
Author: Dan McDonald 
Category: Assembly/Bench Test 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: Leak check following tweaking of cooling line gaps 

Maico, Chad and I conducted a leak check on all affected lines following tweaking of cooling line gaps. All lines pumped down to a level of 10-9 torrliter/sec with no leaks detected with Helium.

ELOG V2.9.2-2455