Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1592     Entry time: Wednesday, August 02, 2017, 15:41
Author: Keith C Ng 
Category: Assembly/Bench Test 
Type: Development 
Module:  
Target/Number:  
Subject: spare source tray build 

After re zeroing alignment telescope to master jig and adjusted parts into place:

 

Orientation: X = Left -, Right+; Y = Up +, Down -

 

Front wire target

X = 0.000, Y = 0.000

 

Rear wire target

X = 0.000, Y = +.008" (high)

 

All fasteners torqued to specification, steerer housing and assembly not installed yet. Weight of steerer assembly might cause rear to sag into place. Otherwise may attempt to split difference between the front and rear elements (alignment is on an angle in the horizontal vertical plane.)

Attachment 1: 20170802_sourcetray_RHB_8264.JPG  4.273 MB  | Show | Hide all
Attachment 2: 20170802_sourcetray_RHB_8266.JPG  4.160 MB  | Show | Hide all
ELOG V2.9.2-2455