Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1723     Entry time: Thursday, May 24, 2018, 15:19
Author: Keith C Ng 
Category: Assembly/Bench Test 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: tm 2 source tray build 

Attached alignment check notes after brazing and fabrication.

First page lower half shows establishment of baseline using master jig

Second page top half shows the alignment of the target mounting plate jig and the steerer cone aperture.

Second page bottom half shows alignment of the master target jig. Master target jig needed the 9 pin and heat shield locating features removed to seat the target correctly.

Overall, source tray assembly sits .006" high on average (min .003", max .010"), .003" to the left with respect to ion beam axis.

Attachment 1: 20180524_alignmentcheckresults.pdf  284 kB  | Show | Hide all
ELOG V2.9.2-2455