  2417   Tuesday, February 14, 2023, 11:36 David WangAssembly/Bench TestRepair  Turbo pump BVs o-ring replacement.

Five of used  internal leaked  TP BVs are serviced and repaired. Internal plunge  o-ring and case o-ring are replaced on all five BVs. Leak checked valves after  . They are ok to be used as spare parts.  The are active parts stored in TH now.

  2431   Friday, April 14, 2023, 10:01 Adam NewsomeAssembly/Bench TestRepair  Assaying Turntable Repair

The spent target assaying turntable was repaired. It was tested today with a load exceeding the maximum it would need to handle during rotation (100 kg). It works as expected and is ready for operation.

  2460   Tuesday, June 20, 2023, 12:37 Adam NewsomeAssembly/Bench TestDevelopment  Modifications to wire ropes for pails within existing F-308s

Based on a request from CNL (attached), modifications were made to the wire ropes protruding through the tops of F-308s to add a crimped loop which acts as a lifting feature. Tests were performed (report attached) on 10 sample units to validate the strength of these loops, since each loop could not be tested in-situ once the pails were already packed in F-308s. CNL has reviewed and approved the test report.

Wire ropes within the following F-308s, which were staged for shipping as of June 20, 2023, were modified to include the lifting loop:

  1. 06
  2. 13
  3. 15
  4. 16
  5. 19
  6. 20
  7. 21
  8. 22

Each lifting loop was:

  • Crimped according to the same procedure, using the same parts and tools, as the 10 sample units
  • Measured using a tape measure to confirm the 3" size specified by CNL
  • Checked using a go/no-go gauge provided from the crimp tool manufacturer
  • "Pull tested" by hand as a quick check to confirm the crimps were successful (not a quantitative and official test, but a secondary qualitative "feel good" check)

As of the time of writing this e-log, TRIUMF believes these F-308s to be ready to ship.

Attachment 1: PXL_20230620_182524722.jpg
PXL_20230620_182524722.jpg
Attachment 2: PXL_20230620_182446158.jpg
PXL_20230620_182446158.jpg
Attachment 3: PXL_20230620_182549601.jpg
PXL_20230620_182549601.jpg
Attachment 4: PXL_20230620_184840103.jpg
PXL_20230620_184840103.jpg
Attachment 5: Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf
Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf Triumf_Acceptance_Requirements_for_Intermediate_Level_Waste_Storage_at_CNL.pdf
Attachment 6: TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf
TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf TRIUMF_Existing_Pail_Test_Report_(2023-06-09).pdf
  2549   Wednesday, March 13, 2024, 11:12 Keith C NgAssembly/Bench TestRepairTM3 optics tray for tm3

Alignment notes attached for the optics tray for the refurbished tm3 with the new service and source tray.

 

*Note: Drive screw bracket sheared off during alignment check with source tray. The drive bracket was replaced. The optics tray was re checked. The front element was .015 to left and centered u/d. The rear element remained the same. The center element could not be checked to do the assembly.

Attachment 1: 20240313_optics_tray_alignment_notes.pdf
20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf 20240313_optics_tray_alignment_notes.pdf
  2719   Thursday, November 21, 2024, 14:11 Frank Song5 Shielding BlocksStandard OperationTM4UCx#46shielding blocks transfer

 Shielding blocks have been moved from ITE to ITW and MAA is secured.

  2735   Monday, December 09, 2024, 13:10 Frank Song5 Shielding BlocksStandard OperationTM3UCx#47shielding blocks transfer

 5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving.

  2740   Friday, January 03, 2025, 12:34 Frank Song5 Shielding BlocksMaintenance UCx#47shielding blocks moving

 Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025 winter shut down .