2704
|
Thursday, October 10, 2024, 12:20 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall | A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be |
|
2705
|
Friday, October 11, 2024, 15:59 |
Aaron Tam | Facilities | Repair | | | ISAC B2 North Hot Cell Phone Fixed | Resolution comment / Commentaire
de résolution:
|
|
2706
|
Tuesday, October 15, 2024, 12:57 |
Frank Song | ITW/ITE | Standard Operation | | | shielding blocks transfer | 5 shielding blocks are transferred
from ITW to ITE, Target Area is secured again
after moving. |
|
2708
|
Thursday, October 24, 2024, 10:37 |
David Wang | Conditioning Station | Standard Operation | | | TCS water system functionnal test. | TCS water system has been started for functional
test. System parameters including pressure,
all temperature sensors, flow rate sensors, |
|
2718
|
Monday, November 18, 2024, 12:18 |
Aaron Tam | South Hot-Cell | Repair | | | SHC West Manipulator Repair | November 14, 2024 - Aaron Tam w/
Chad Fisher
Following ID: |
|
2720
|
Monday, November 25, 2024, 09:56 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 move - silo to SHC | TM3 was moved from silo to SHC with no
target. Move successful. |
|
2722
|
Tuesday, November 26, 2024, 13:54 |
Adam Newsome | Conditioning Station | Standard Operation | TM3 | | TM3 move - SHC to TCS | TM3 was moved from SHC to TCS with UCx#47.
The move was smooth. |
|
2726
|
Tuesday, December 03, 2024, 10:51 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 move - ITE to SHC | TM2 was moved from ITE to SHC with Ta#68
target. During the move, a railing was lightly
bumped by the corner of the module - no obvious |
|
2727
|
Tuesday, December 03, 2024, 12:28 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM3 move - TCS to ITE | TM3 was moved with UCx#47 from TCS to ITE.
The move was smooth. |
|
2730
|
Wednesday, December 04, 2024, 09:00 |
David Wang | Facilities | Standard Operation | TM2 | | all water lines on TM2 have been purged. | all water lines on TM2 have been purged.
Refilled them(except HS ) with 60psi nitrogen
for module silo storage before next year |
|
2731
|
Wednesday, December 04, 2024, 10:40 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 move - SHC to silo | TM2 was remotely moved from the South Hot
Cell to SW Silo. Reading at SHC = 89.8 mSv/h.
The move was smooth. |
|
2736
|
Wednesday, December 18, 2024, 12:18 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Five Pails Transferred from Main Vault to Mini Vault | Five pails were transferred from main vault
to mini vault. Note that there was already
one pail in the mini vault, so at present |
|
2737
|
Wednesday, December 18, 2024, 14:17 |
Adam Newsome | Pail Handling Tool | Maintenance | | | Pail Handling Tool - Inspection | An informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main |
|
2738
|
Friday, January 03, 2025, 09:59 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall | A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be |
|
2744
|
Thursday, January 09, 2025, 11:08 |
David Wang | Facilities | Maintenance | | | ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings | ITH:MP1 is deteriorating by watching on
ITH:CG1 and CG2 readings and investigation
in pit. A fault 17644 has been issued. this |
|
2751
|
Monday, January 20, 2025, 11:33 |
Adam Newsome | Waste Package/Ship | Standard Operation | | | F-308 flask loading - six flasks loaded | Today (2025-01-20), six flasks were loaded
in preparation for shipment with the following
targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10, |
|
2752
|
Tuesday, January 21, 2025, 10:46 |
David Wang | ITE/ITW | Standard Operation | | | ITW/ITE pit general annual cleaning up. | ITW/ITE pit general annual cleaning up
were done. all concrete floor and TM equipment
surface are vacuum cleaned. HV cage |
|
2753
|
Wednesday, January 22, 2025, 10:29 |
Frank Song | Faraday Cage | Maintenance | | | Annual clean up for ITE/ITW Faraday cages | David and I cleaned both cages in
ISAC1 electric room, all done. |
|
2756
|
Wednesday, January 29, 2025, 09:06 |
David Wang | ITE/ITW | Standard Operation | | | ITE and ITW water system paddle wheels and coils on flow sensors have been replaced | ITE and ITW water system paddle wheels
and coils on all flow sensors in pits have
been replaced. It's a SAS job. |
|
2757
|
Wednesday, January 29, 2025, 11:10 |
chad fisher | South Hot-Cell | Standard Operation | | | Pre-entry field Check | Fields in the hot cell were checked using
a pole monitor. Field approximately in the
area someone would stand to repair manip. |
|