Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2720     Entry time: Monday, November 25, 2024, 09:56
Author: Adam Newsome 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number:  
Subject: TM3 move - silo to SHC 

TM3 was moved from silo to SHC with no target. Move successful.

ELOG V2.9.2-2455