  45   Monday, October 31, 2011, 08:51 Travis CaveSouth Hot-CellStandard OperationTM4SiC#26 High PoweredModule moveTM#4 with SiC#26 HP moved from the south
hot cell to the conditioning station.
  
  44   Friday, October 28, 2011, 14:42 Bevan MossSouth Hot-CellMaintenanceTM4 Leak check on service cap feed through After Chad and Davids leak check
results from the containment box it was decided
to perform a leak check on the feed through
 IMG_1906.JPGIMG_1905.JPGIMG_1908.JPG 
  43   Friday, October 28, 2011, 14:29 Bevan MossConditioning StationStandard OperationTM4 Leak Check on October 27/10/2011A leak check was performed on the module
on October 27/10/2011 by David Wang and was
reported to Bevan Moss but it never made
  
  42   Friday, October 28, 2011, 09:37 chad fisherSouth Hot-CellStandard OperationTM4SiC#26 HP FebiadSiC#26 installed on TM4HP febiad target SiC#26 was installed onto
Tm4 on Monday morning.
"JP's" connector required
  
  41   Friday, October 28, 2011, 09:30 chad fisherSouth Hot-CellRepairTM4 Tube Heater + Leak Check C.B.Base Pressure: 0.0x10-4
Stable Leak Rate: 0.0x10-9
Leak check of tube heater circuit,
  
  40   Friday, October 28, 2011, 08:24 Travis CaveConditioning StationStandard OperationTM4SiC#26 High PoweredModule moveTM#4 moved from conditioning station to
south hot cell. For further leak checking.
  
  39   Tuesday, October 25, 2011, 16:57 Bevan MossConditioning StationStandard OperationTM4 Turbo Pump 1 issuesRoughing on TM1 started at ~15:00 today
by ~16:30 the module had reached a pressure
of ~200 mTorr and the turbo pumps were turned
  
  38   Tuesday, October 25, 2011, 11:58 Travis CaveSouth Hot-CellStandard OperationTM4SiC#26 High PoweredModule moveTM#4 with SiC#26 HP has been moved from
the south hot cell to the conditioning station.
  
  37   Tuesday, October 25, 2011, 08:47 Travis CaveSouth Hot-CellStandard OperationTM4SiC#26 High PoweredElectrical checkTM#4 with SiC#26 HP has been checked electrically
it has passed. It was noted that the Megger
check of the Oven to Chassis (earth ground)
  
  36   Wednesday, October 05, 2011, 09:41 Travis CaveSpent Target VaultStandard Operation UCx#2Spent target moveThe spent UCx #2 target has been moved
into storage. It was placed in tray 5A and
is in Pail #91, it was 8.91mSv/hr upon removal
  
  35   Tuesday, October 04, 2011, 14:13 Travis CaveITWStandard OperationTM1TaC#1Move ot TM#1Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station.
  
  34   Monday, October 03, 2011, 14:52 Travis CaveSouth Hot-CellStandard OperationTM1TaC#1Electrical checkTM#1 with TaC#1 installed passed the electrical
test. With a value of 882MOhms that was meggered
from the heat shield to the chassis, all
  
  33   Monday, October 03, 2011, 11:54 chad fisherSouth Hot-CellStandard OperationTM1UCx#2 - TaC#1Target change UCx#2-TaC#1UCx#2 has been removed from Tm1 and put
in a bucket with a slow argon feed and a
lid placed lossely on top.
  
  32   Monday, October 03, 2011, 11:00 Travis CaveITWStandard OperationTM1UCx#2Move from west station to south hot cellTM#1 with UCx#2 has been moved from the
west station to the south hot cell. Move
went well.
  
  31   Thursday, September 29, 2011, 11:11 Travis CaveSpent Target VaultStandard Operation Ta#36Spent target moveThe spent Ta#36 has been moved to the storage
vault. It was placed in pail #90, and placed
into slot 3B, it was 111mSv/hr upon removal
  
  30   Wednesday, September 28, 2011, 11:59 Travis CaveSouth Hot-CellStandard OperationTM4no targetTM#4 moved from South Hot Cell to to North East Silo.TM#4 moved from South Hot Cell to to North
East Silo, move went well.
  
  29   Wednesday, September 28, 2011, 10:06 chad fisherSouth Hot-CellStandard OperationTM4Ta#36Ta#36 RemovalTa#36 was removed from target module 4.
The standard, unexplained, un-investegated,
un-resolved "arc" were again present
  
  28   Wednesday, September 28, 2011, 09:07 Travis CaveITEStandard OperationTM4Ta#36Move of TM#4 from East target station to south hot cell.Move of TM#4 with Ta#36 from East target
station to south hot cell, move went well.
  
  27   Wednesday, September 14, 2011, 10:32 Travis CaveSpent Target VaultStandard Operation Ta#37Spent target moveTa#37 has been moved from the south hot
cell into the storage vault. The target is
in pail #89 and in spot 6A in the vault.
  
  26   Thursday, September 01, 2011, 09:11 Don JacksonITWStandard OperationTM1UCx#2Argon Venting West StationWest target station is setup to use argon
for tank venting.  There is 1200 PSI
remaining on argon bottle in electrical room. 
  