Message ID: 69     Entry time: Thursday, January 12, 2012, 08:43
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Spent targets to F-308s 

All targets in the mini storage have been moved to F-308s and those flasks have been moved over to rad waste. The transfer of target occurred on January 10th and the flasks were moved to rad waste on January 11th.  Contamination was found on the bottoms of some of the pails and was removed, some of the contamination was difficult but not impossible to remove from the pail bottoms.