Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 70     Entry time: Thursday, January 12, 2012, 14:32
Author: David Wang 
Category: ITE 
Type: Repair 
Module: TM4 
Target/Number:  
Subject: TP2 on TM4 has been replaced  

TP2 on TM4 has been replaced with a new turbo pump , I didnt  reset the controller in electrical room.So this new pump start to run at 8083 hours on ITE TP2 controller. The new TP2 pump properly  started. It works fine now.

ELOG V2.9.2-2455