Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 131 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  2427   Monday, March 13, 2023, 11:25 Carla BabcockITE/ITWDevelopment  10kOhm resistors installed in ITE/ITW faraday cagesOn Sept. 14 2022, a 10kOhm 30W resistor
was installed in each target station faraday
cage, in line with the HV bias supply. This
 ITE_ITW_BIASresistor.docx 
  2428   Thursday, March 30, 2023, 14:29 Frank SongITE/ITWDevelopment  Preparation of target stations for FEBIAD runsHelium cylinder and  Argon cylinder
are installed in both ITE/ITW faraday cages
, regulator for outlet pressure are not set
 1_(5).png1_(2).png 
  2429   Monday, April 03, 2023, 07:55 chad fisherNorth Hot-CellStandard Operation  NHC, SHC field checkNHC is 1.26 mSv/h inside approximately
.5m from table surface, between manipulators
 
  
  2430   Tuesday, April 11, 2023, 11:35 chad fisherNorth Hot-CellStandard Operation  NHC fields post sample removalThe fields in the NHC after removal of
Ferran's graphite sample is 238 uSv/h. This
again seems to emanate for the items in the
  
  2431   Friday, April 14, 2023, 10:01 Adam NewsomeAssembly/Bench TestRepair  Assaying Turntable RepairThe spent target assaying turntable was
repaired. It was tested today with a load
exceeding the maximum it would need to handle
  
  2432   Tuesday, April 18, 2023, 07:28 chad fisherNorth Hot-CellMaintenance  NHC entry summaryNHC was entered on April 17, 2023 for inspection
and maintenance. Summary :
Compressible and non-compressible
  
  2433   Monday, April 24, 2023, 10:18 David WangCoolingMaintenance  HALCW flowmeter transmotters inspetion and calibration. ITW, ITE, ITW +ITE total , and low active
cooling water return flow meter transmitters
are inspected and calibrated.  Result:
  
  2434   Friday, April 28, 2023, 21:39 David WangConditioning StationStandard Operation  TCS cooling water system was started and tested this WednesdayTCS cooling water system was started and
tested this Wednesday. Chiller compressor
2 and 3 was in operation cycle twice without
  
  2435   Tuesday, May 02, 2023, 17:18 David WangITEStandard Operation  ITE 4 turbopumps are started for preoperation check. ITE TP3,4, 1S,and 4S were started successfully
this afternoon. All pump current draws 
were below 1.5A . IG1S was switched on. I
  
  2436   Wednesday, May 03, 2023, 11:04 Adam NewsomeCraneMaintenance  Pail Handling Tool - Annual InspectionThe pail handling tool which is used to
move 5 gallon pails around the target hall
was inspected by A. Newsome, N. Jorgenson,
 PXL_20230503_172503014.jpgPXL_20230503_172457837.jpgPXL_20230503_172454009.jpg 
  2437   Wednesday, May 03, 2023, 13:22 David WangITEStandard Operation  Argon vented ITE station. Argon vented ITE station. ITEVV1S and ITGT
SV3 were closed after venting. 
  
  2438   Thursday, May 04, 2023, 07:14 David WangSafe Module ParkingStandard OperationTM4  SMP vacuum pumpimg down is stopped. SMP  vacuum pumping down is stopped.
SMP and TM4 venting to atmosphere will be
started soon. 
  
  2441   Friday, May 12, 2023, 09:56 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism Test The emergency close
mechanism for the Storage Vault door was
  
  2446   Thursday, May 25, 2023, 13:10 David WangConditioning StationMaintenanceTM2 TCS MP1 is replaced due to poor performace. TCS MP1 is replaced due to poor performance(
system shows unstable and high reading on
TCSCG1A and high TP1,TP2 current draw) .
  
  2450   Tuesday, May 30, 2023, 14:15 David WangITWStandard Operation  ITW water signal interlock check is done.ITW water signal interlock check is done.
All ITW water signals including HS, EE, Coil
, Ta, Tu, MSP, C-window, HVC1, HVC2, 2A-dump,
  
  2451   Tuesday, May 30, 2023, 14:19 David WangITE/ITWStandard Operation  BL2A MAA primary beam exclusion area ASU test. MAA ASU test have been done following document
154779. All three tests in document are passed.
DCR Jas has all test documents.
  
  2452   Tuesday, June 06, 2023, 15:10 Antoniette YapSpent Target VaultMaintenance   Annual Inspection of Main and Mini Storage VaultsThe annual inspection of the mini-storage
vault and main storage vault was completed
June 23, 2023. The following items were checked:
  
  2454   Monday, June 12, 2023, 07:36 David WangConditioning StationStandard Operation  TCS water filters annual change. Plant group changed TCS water filters last
Friday. 4 filters on resin can inet /outlet
sides and filters(4 in one cartridge house)on
  
  2459   Wednesday, June 14, 2023, 13:37 David WangITEStandard OperationTM4 ITE water signal interlock checkITE water signal interlock check including
HS,EE, TA, TU, MSP. Coil1 , C-window ,2a-window,
2A tank, 2A shielding plug , 2A dump, 2A
  
  2460   Tuesday, June 20, 2023, 12:37 Adam NewsomeAssembly/Bench TestDevelopment  Modifications to wire ropes for pails within existing F-308sBased on a request from CNL (attached),
modifications were made to the wire ropes
protruding through the tops of F-308s to
 6x 
ELOG V2.9.2-2455