  2399   Friday, December 16, 2022, 16:39 Adam NewsomeCraneStandard Operation  Crane powered off for holidays[edit 2023-01-03] The crane was powered
back on this morning - there do  not appear
to be any faults and it seems that the crane
  
  2400   Friday, January 06, 2023, 09:41 Adam NewsomeSpent Target VaultStandard Operation  Pails moved to mini-storage vaultThe following three pails were moved from
the main storage vault to the mini-storage
vault:
 Target_Index_2023-01-06.pdf 
  2401   Friday, January 06, 2023, 10:38 David WangITWStandard OperationTM2 ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test. ITW
 and TM2 primary and secondary vacuum
 ITW_vacuum_leak_check_2023.pdf 
  2406   Tuesday, January 24, 2023, 07:21 David WangITWMaintenance  ITW pit general clean up.  ITW  was cleaned with vacuum
canister in Jan 10th. HV  cage inside
and blue  nylon insulators were wiped. 
  
  2407   Tuesday, January 24, 2023, 07:26 David WangConditioning StationStandard Operation  TH floor moping and garbage collelctions.Plant group and us  finished TH floor
mopping and garbage collections last Wednesday.
Th moping head had 800 count after using.
  
  2411   Friday, January 27, 2023, 07:11 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.Tom Kauss inspected target hall crane yesterday.
The crane works fine. Tom has this inspection
record in his file. The inspection tag has
  
  2412   Friday, January 27, 2023, 07:15 David WangCraneStandard Operation  Target hall Crane annual inspection has beend done.Tom Kauss  finished TH crane annual
inspection yesterday. The crane woks fine.
Tom has this inspection record in his file.
  
  2413   Friday, January 27, 2023, 07:18 David WangCraneStandard Operation  Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02Tom Gauss inspected  two target module
lifting frames ITA0494-1997-01  and ITA0494-1997-02
yesterday. He certified the use of these
  
  2414   Friday, January 27, 2023, 07:25 David WangCraneStandard Operation  Inspection of TH crane below hook attachment pins and plates ITA6550-01Tom Kauss inspected target hall crane below
hook attachment pins and  plates ITA6550-01
yesterday. He certified the use of these
  
  2416   Monday, February 13, 2023, 09:57 David WangITWMaintenance  ITW/ITE primary vacuum back up lines and BVs leak check in target pit. In past two weeks, ITW/ ITE primary vacuum
back up lines and BVs in ITW/ITE pit have
been leak checked.  ITW BV1 and BV2
  
  2417   Tuesday, February 14, 2023, 11:36 David WangAssembly/Bench TestRepair  Turbo pump BVs o-ring replacement. Five of used  internal leaked 
TP BVs are serviced and repaired. Internal
plunge  o-ring and case o-ring are replaced
  
  2418   Wednesday, February 22, 2023, 09:22 Carla BabcockITE/ITWStandard Operation  HV testing of ITE/ITWFeb. 16 2023: HV tests done on ITE station.
Ramped up to 59kV but was not stable there,
current draw was very unstable and was sparking
 Screenshot_from_2023-02-16_13-19-44.pngScreenshot_from_2023-02-22_09-20-14.pngScreenshot_from_2023-02-24_17-41-33.png 
  2419   Wednesday, March 01, 2023, 09:27 David WangCoolingMaintenance  Two filters on HALCW resin circuit have been replaced. Two filters on HALCW resin circuit have
been replaced. O-ring 235# were changed on
both filter cartridge houses.  25micron 
  
  2420   Wednesday, March 01, 2023, 09:34 David WangCoolingMaintenance  Visual inspection of HALCW for possible small water leak or drip. I visually inspected HALCW system including
water station section, both target pits,
and de-ionizer system.  No small leak
  
  2421   Wednesday, March 01, 2023, 10:01 David WangITE/ITWDevelopment  vacuum pit ventilation upgrade. vacuum pit ventilation upgrade was done
last week. The jobs include: installed two
industrial cooling  fans.  One
  
  2422   Monday, March 06, 2023, 11:31 Adam NewsomeNorth Hot-CellRepair  Spare Telemanipulator: Y-Motion Linear Actuator RepairThe linear actuator used for the Y-motion
motor assistance on the spare telemanipulator
was replaced and tested. It was observed
  
  2423   Tuesday, March 07, 2023, 10:37 chad fisherNorth Hot-CellRepair  Spare Telemanipulator: Y-Motion Linear Actuator Repair


   
        
            
  
  2424   Wednesday, March 08, 2023, 06:32 David WangCoolingMaintenance  HALCW flow sensors replacement. HALCW flow sensors replacement job is done.
All ITE/ITW(except ITE HS) return line water
flow sensors including paddle wheels and
  
  2425   Wednesday, March 08, 2023, 09:19 David WangCoolingStandard Operation  HALCW ITC:MP1/MP2 motor phase current measurement. HALCW ITC:MP1/MP2 motor phase current measurement
is done by Joel from electrician group. MP1:17.1A/17.2A/16.7A. 
MP2: 17.9A/17.9A/17.3A.   19.5A
  
  2426   Wednesday, March 08, 2023, 13:57 David WangCoolingStandard Operation  HALCW ITC:MP1/MP2 pump and motor temerature measurementsHALCW ITC:MP1/MP2 pump and motor temperature
measurements result:
MP1: pump discharging  port:
  