ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
2399
|
Friday, December 16, 2022, 16:39 |
Adam Newsome | Crane | Standard Operation | | | Crane powered off for holidays | [edit 2023-01-03] The crane was powered
back on this morning - there do not appear
to be any faults and it seems that the crane |
|
2400
|
Friday, January 06, 2023, 09:41 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Pails moved to mini-storage vault | The following three pails were moved from
the main storage vault to the mini-storage
vault: |
|
2401
|
Friday, January 06, 2023, 10:38 |
David Wang | ITW | Standard Operation | TM2 | | ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test. | ITW
and TM2 primary and secondary vacuum |
|
2406
|
Tuesday, January 24, 2023, 07:21 |
David Wang | ITW | Maintenance | | | ITW pit general clean up. | ITW was cleaned with vacuum
canister in Jan 10th. HV cage inside
and blue nylon insulators were wiped. |
|
2407
|
Tuesday, January 24, 2023, 07:26 |
David Wang | Conditioning Station | Standard Operation | | | TH floor moping and garbage collelctions. | Plant group and us finished TH floor
mopping and garbage collections last Wednesday.
Th moping head had 800 count after using. |
|
2411
|
Friday, January 27, 2023, 07:11 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss inspected target hall crane yesterday.
The crane works fine. Tom has this inspection
record in his file. The inspection tag has |
|
2412
|
Friday, January 27, 2023, 07:15 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss finished TH crane annual
inspection yesterday. The crane woks fine.
Tom has this inspection record in his file. |
|
2413
|
Friday, January 27, 2023, 07:18 |
David Wang | Crane | Standard Operation | | | Inspection of target module lifing frame ITA0494-1997-01 and ITA0494-1997-02 | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02
yesterday. He certified the use of these |
|
2414
|
Friday, January 27, 2023, 07:25 |
David Wang | Crane | Standard Operation | | | Inspection of TH crane below hook attachment pins and plates ITA6550-01 | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01
yesterday. He certified the use of these |
|
2416
|
Monday, February 13, 2023, 09:57 |
David Wang | ITW | Maintenance | | | ITW/ITE primary vacuum back up lines and BVs leak check in target pit. | In past two weeks, ITW/ ITE primary vacuum
back up lines and BVs in ITW/ITE pit have
been leak checked. ITW BV1 and BV2 |
|
2417
|
Tuesday, February 14, 2023, 11:36 |
David Wang | Assembly/Bench Test | Repair | | | Turbo pump BVs o-ring replacement. | Five of used internal leaked
TP BVs are serviced and repaired. Internal
plunge o-ring and case o-ring are replaced |
|
2418
|
Wednesday, February 22, 2023, 09:22 |
Carla Babcock | ITE/ITW | Standard Operation | | | HV testing of ITE/ITW | Feb. 16 2023: HV tests done on ITE station.
Ramped up to 59kV but was not stable there,
current draw was very unstable and was sparking |
|
2419
|
Wednesday, March 01, 2023, 09:27 |
David Wang | Cooling | Maintenance | | | Two filters on HALCW resin circuit have been replaced. | Two filters on HALCW resin circuit have
been replaced. O-ring 235# were changed on
both filter cartridge houses. 25micron |
|
2420
|
Wednesday, March 01, 2023, 09:34 |
David Wang | Cooling | Maintenance | | | Visual inspection of HALCW for possible small water leak or drip. | I visually inspected HALCW system including
water station section, both target pits,
and de-ionizer system. No small leak |
|
2421
|
Wednesday, March 01, 2023, 10:01 |
David Wang | ITE/ITW | Development | | | vacuum pit ventilation upgrade. | vacuum pit ventilation upgrade was done
last week. The jobs include: installed two
industrial cooling fans. One |
|
2422
|
Monday, March 06, 2023, 11:31 |
Adam Newsome | North Hot-Cell | Repair | | | Spare Telemanipulator: Y-Motion Linear Actuator Repair | The linear actuator used for the Y-motion
motor assistance on the spare telemanipulator
was replaced and tested. It was observed |
|
2423
|
Tuesday, March 07, 2023, 10:37 |
chad fisher | North Hot-Cell | Repair | | | Spare Telemanipulator: Y-Motion Linear Actuator Repair |
|
|
2424
|
Wednesday, March 08, 2023, 06:32 |
David Wang | Cooling | Maintenance | | | HALCW flow sensors replacement. | HALCW flow sensors replacement job is done.
All ITE/ITW(except ITE HS) return line water
flow sensors including paddle wheels and |
|
2425
|
Wednesday, March 08, 2023, 09:19 |
David Wang | Cooling | Standard Operation | | | HALCW ITC:MP1/MP2 motor phase current measurement. | HALCW ITC:MP1/MP2 motor phase current measurement
is done by Joel from electrician group. MP1:17.1A/17.2A/16.7A.
MP2: 17.9A/17.9A/17.3A. 19.5A |
|
2426
|
Wednesday, March 08, 2023, 13:57 |
David Wang | Cooling | Standard Operation | | | HALCW ITC:MP1/MP2 pump and motor temerature measurements | HALCW ITC:MP1/MP2 pump and motor temperature
measurements result:
MP1: pump discharging port: |
|