Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2407     Entry time: Tuesday, January 24, 2023, 07:26
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: TH floor moping and garbage collelctions. 

Plant group and us  finished TH floor mopping and garbage collections last Wednesday. Th moping head had 800 count after using. all garbage were bagged , checked, tagged, and sent to radwaste area.

ELOG V2.9.2-2455