1670
|
Friday, December 22, 2017, 11:09 |
Anders Mjos | ITW | Standard Operation | TM2 | | Shut down High Active Cooling water | Stopped MP1 today in preparation for the
power outage over the holidays. both P-25
and P-26 breakers have been switched off |
|
1673
|
Tuesday, January 02, 2018, 14:47 |
Anders Mjos | Conditioning Station | Standard Operation | | | Pumping on secondary vacuum | Tuesday, January 02, 2018, 14:45: TP1S
started |
|
1674
|
Tuesday, January 02, 2018, 15:17 |
Anders Mjos | Conditioning Station | Maintenance | | | Tested chiller | Tested all 3 compressors and MP2 |
|
1675
|
Thursday, January 04, 2018, 13:28 |
Anders Mjos | Conditioning Station | Maintenance | | | Troubleshooting IG1S | TCS:IG1S is reporting vacuum levels that
seem to be too low (1E-10 to 1E-8 Torr).
The gauge was connected to the controller |
|
1677
|
Tuesday, January 16, 2018, 10:36 |
Anders Mjos | Spent Target Vault | Standard Operation | TM2 | | Old TM2 Source Tray moved to Cyclotron basement | The old TM2 Source Tray from 2009 has been
moved to Cyclotron basement this morning.
Source tray was stored in location 9. The |
|
1679
|
Wednesday, January 17, 2018, 10:38 |
Anders Mjos | Spent Target Vault | Standard Operation | TM1 | | Old TM1 Source Tray moved to Cyclotron basement | The old TM1 Source Tray from 2011 has been
moved to Cyclotron basement this morning.
Source tray was stored in location 10. The |
|
1685
|
Tuesday, February 13, 2018, 13:54 |
Anders Mjos | ITE | Standard Operation | TM4 | SiC#37 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th |
|
1686
|
Tuesday, February 13, 2018, 13:56 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#55 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th. One of the water couplings were leaking
for a short while when disconnected. NCR |
|
1687
|
Wednesday, February 14, 2018, 10:06 |
Anders Mjos | ITW | Maintenance | TM2 | | Replaced parker couplings on Window cooling line | By Anders & David. Couplings will be
taken apart for inspection. |
|
1688
|
Friday, February 16, 2018, 13:46 |
Anders Mjos | ITW | Maintenance | TM2 | | Parker coupling inspection | Findings and photos from the inspections
attached. The inspection was conducted by
Anders, David and Maico. |
|
1709
|
Thursday, May 03, 2018, 13:26 |
Anders Mjos | South Hot-Cell | Repair | TM4 | | EZL short troubleshooting | Yesterday Aaron, Isaac and Anders inspected
the EZL connection from the service chase
to the optics tray using the goose neck camera |
|
1711
|
Friday, May 04, 2018, 15:46 |
Anders Mjos | South Hot-Cell | Repair | TM4 | | EZL short troubleshooting |
|
|
1715
|
Thursday, May 17, 2018, 11:30 |
Anders Mjos | Conditioning Station | Maintenance | TM4 | | HV test/conditioning of damaged source tray | BIAS only. Water lines looped on top. Containment
box off.
Thursday, May 17, 2018, 11:20: Vacuum |
|
1718
|
Tuesday, May 22, 2018, 10:02 |
Anders Mjos | Conditioning Station | Repair | | | Water leak from TK1 over the weekend | Link
to e-log,
Link |
|
1721
|
Thursday, May 24, 2018, 10:02 |
Anders Mjos | ITE | Development | TM4 | Empty | Module move ventilation test | The new module move ventilation procedure
was successfully tested (ITM:MP2). ITM:CM4
did not drop below 6 in during the test. |
|
1732
|
Friday, June 08, 2018, 10:22 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#22 | Module move |
|
|
1741
|
Monday, June 25, 2018, 16:42 |
Anders Mjos | Conditioning Station | Development | | | Testing new high current connectors | Shorted TGHT with new high current connector
assembly and heated to 600 A. Temperature
measured on half way point on cable ~ 70 |
|
1751
|
Wednesday, July 11, 2018, 15:06 |
Anders Mjos | ITW | Standard Operation | TM2 | Nb#8 | Block move | Maico and Travis moved blocks from ITE
to ITW yesterday |
|
1752
|
Wednesday, July 11, 2018, 15:09 |
Anders Mjos | ITW | Maintenance | TM2 | Nb#8 | Uncovered ITW to toubleshoot 2A2M19 | The 2A2M19 beam profile monitor did not
work and was e-faulted.
After initial troubleshooting 2 blocks were |
|
1753
|
Monday, July 16, 2018, 17:41 |
Anders Mjos | ITE | Standard Operation | TM4 | UC#22 | Target module disconnected | The water and electrical connections were
disconnected today as protons remained off
after power interruption during the weekend. |
|