Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1483     Entry time: Thursday, April 06, 2017, 15:16
Author: Anders Mjos 
Category: Conditioning Station 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Installation of new break out box to accommodate both ITM:MP2 and TCS:MP1 

Installation by Marshall. Dave M from controls adjusted circuitry to get TCS:MP1 to start.

Work is being done in preparation for the Module Move Ventilation SAS project

ELOG V2.9.2-2455