Message ID: 1361     Entry time: Saturday, September 24, 2016, 11:23
Author: Anders Mjos 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: SiC#34 
Subject: Conditioning SiC#34 

Conditioning by ISAC operations

Saturday, September 24, 2016, 11:15: RGA on for heater conditioning. (kept off during HV conditioning)


Sunday, September 25, 2016, 07:44: TGHT and TBHT voltage jumps during heater ramping. Likely contact between target and heat shield. Contacted ISAC operations and asked to abort ramping at current values. TGHT/TBHT 500 /270 A


Monday, September 26, 2016, 08:22: ISAC operations resuming ramping to 550 A. Corrected TGHT voltage at ISAC TS was ~6.2 V at 580 A. Expected voltage at TCS would then be 6.2 + (3.4+2.9)E-3*580 = 9.9 V. Limit set at 9.5 V.

Monday, September 26, 2016, 09:09: Increased TGHT voltage limit to 9.6 V to allow it to reach 550 A.

Monday, September 26, 2016, 10:17: Voltage limit increased to 10.2 V which allowed the current to go to 575 A


Tuesday, September 27, 2016, 08:08: Conditioning complete. Ran at 575 / 270 A and 47 kV for about 1 hour. Conditioned cold to 49 kV.

Attachment 1: SiC#34.docx  1.429 MB  Uploaded Tuesday, September 27, 2016, 09:09
Attachment 2: TCS-2016-09-22_SiC#34.rga  272 kB  Uploaded Tuesday, September 27, 2016, 09:09
Attachment 3: TCS-2016-09-24_SiC#34.rga  718 kB  Uploaded Tuesday, September 27, 2016, 09:10
ELOG V2.9.2-2455