Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1531     Entry time: Wednesday, May 10, 2017, 13:42
Author: Anders Mjos 
Category: Conditioning Station 
Type: Repair 
Module:  
Target/Number:  
Subject: Leaky gauge at TCS:TS2 (e-fault: 9609) 

 Neil Wong will fix this leak tomorrow Friday.  See attached schematics for location.

Attachment 1: IRH1056_-_Leaky_Gauge.pdf  144 kB  | Show | Hide all
ELOG V2.9.2-2455