1822
|
Thursday, November 22, 2018, 08:52 |
Anders Mjos | ITE | Standard Operation | TM4 | Ta#57 | Closed ITE dump water | Paddle wheel signal was tripping proton
beam in ITW. Valved off ITE dump to divert
flow to ITW. Field around valve was about |
|
2471
|
Thursday, August 03, 2023, 12:24 |
Jason Zhang | Crane | Development | | | Cleanup of camera installation on target hall crane, installation of replacement laser | The cleanup of
the ISAC Target Hall crane and installation |
|
818
|
Monday, December 08, 2014, 15:22 |
Anders Mjos | Conditioning Station | Development | TM2 | | Circuit D water test | Monday, December 08, 2014, 14:00: Dan M
and Anders connected the water supply to
circuit D and installed the module cover. |
|
605
|
Monday, February 24, 2014, 11:05 |
chad fisher | South Hot-Cell | Repair | TM2 | | Circuit D blank off | The blank off with the o-ring has been
removed, manipulator fixed, circuit D water
block sealinhg surfaces cleaned and blank |
|
766
|
Thursday, October 16, 2014, 15:40 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller unit | NOTE: If there is a problem with
the chiller unit (ie Fault 1 or Fault 2),
a power cycle may reset the VFDs for the |
|
1090
|
Monday, October 05, 2015, 10:19 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller maintenance | will be performed Tuesday October
6th
Tuesday, October 06, 2015: Maintenance |
|
2218
|
Tuesday, May 25, 2021, 16:20 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller maintenance | A contractor on site today for chiller
maintenance. CP2 and CP3 circuit is leaking
and shall not be used. CP1 can still be used. |
|
359
|
Thursday, May 23, 2013, 14:07 |
Bevan Moss | Conditioning Station | Repair | | | Chiller Unit Repaired | ESC came today and "repaired"
the chiller. There was something wrong with
the VFD controller. The were able to get |
|
317
|
Tuesday, April 23, 2013, 16:11 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | N/A | Chiller Fault 2 | During Testing it was noticed that
Fault 2 was indicated and one of the compressors
would not run. Fault 2 does not indicate |
|
1958
|
Tuesday, August 06, 2019, 01:13 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy HP SIS target | Checks on EE line leak fix and window line leak (not fixed) | TM4 has developed 4 leaks so far:
Line B - seems to be solved
with an indium gasket (some testing already |
|
1631
|
Thursday, September 28, 2017, 15:34 |
Anders Mjos | Conditioning Station | Development | TM2 | | Changes to MP3 startup | Due to problems with the regulating
valve WPV1, the VFD (Variable Frequency Drive)
for the pump has been programmed to do a |
|
1576
|
Wednesday, July 05, 2017, 11:18 |
Anders Mjos | Conditioning Station | Maintenance | TM4 | Ta#52 | Changed electrical configuration to cathode bias | John Chow configured TCS to cathode
bias mode (IRH1538). The anode P/S is in
positive mode. |
|
71
|
Monday, January 16, 2012, 09:30 |
David Wang | ITE | Maintenance | | | Changed all old inducion coils for flow sensors in ITE | I had changed all old induction coils for
flow sensors in ITE .I checked all ITE water
signals on control boards in electrical room.They |
|
1862
|
Thursday, January 24, 2019, 10:34 |
David Wang | ITW | Maintenance | | | Changed 24VDC plugs of TP solenoid valves in ITW | 3 damaged 24VDC plugs of TP solenoid valves
are replaced. Inspected other plugs. All
of them are in good condition now. |
|
215
|
Wednesday, November 14, 2012, 11:04 |
David Wang | ITE | Repair | TM4 | | Change ITE dump water circiut flow wheel | I changed ITE dump water circuit flow wheel
due to its poor performance. The new flow
wheel works fine. The signal on electrical |
|
2368
|
Wednesday, September 28, 2022, 12:58 |
Matthew Gareau | North Hot-Cell | Repair | | | Chad repaired the right operator side manipulator | On 26/Sept/2022
Chad disassembled the right operator
side manipulator, and noticed that gears |
|
899
|
Monday, April 27, 2015, 16:12 |
Keith C Ng | South Hot-Cell | Development | TM2 | | Ceramic Standoffs in TM2 source tray steerer assembly | On drawing ITA6008 for the Encole 0.5"
ceramic standoffs there is a note to match
pairs of ceramics to within +/-0.001". |
|
1129
|
Tuesday, November 24, 2015, 13:54 |
chad fisher | South Hot-Cell | Repair | | | Cell Decon | Decon/removal of large solid waste was
performed on Wednesday November 18th."Hot"
activated items included containment box |
|
1136
|
Wednesday, November 25, 2015, 14:16 |
chad fisher | South Hot-Cell | Repair | | | Cell Decon | Cell (table) was systematically cleaned
with a swiffer and resulting piles of contaminated
waste placed in pail with spent Ta target. |
|
518
|
Tuesday, October 22, 2013, 16:52 |
Bevan Moss | Conditioning Station | Repair | | | Canbus base card for BIAS | The base card in the canbus BIAS
module was determined to be faulty. Dave
Morris removed a card VECC to repair the |
|