Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 455     Entry time: Tuesday, September 17, 2013, 14:36
Author: Bevan Moss 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number:  
Subject: Containment Box has been removed 

 The containment box has been removed. Tomorrow the wiring harness will be installed.

ELOG V2.9.2-2455