Message ID: 2197     Entry time: Friday, March 05, 2021, 09:12
Author: Matthew Gareau 
Category: North Hot-Cell 
Type: Development 
Module: TM3 
Target/Number:  
Subject: Containment box door removal and swivel arm test 

First thing I entered into the NHC to install to the target kart mounting clip, and remove excess tools and materials from the hotcell

After the TM3 without a target was lowered into the NHC.

Once inside, with the use of the manipulators, I was able to remove the containment box door, place it on the swivel arm, move the arm out of the way, after the door was return to the containment box and reattached.

Containment_door_arm_testing_on_TM3.jpg