  RH-ISAC, Page 127 of 136  Not logged in ELOG logo
Entry  Tuesday, September 25, 2012, 14:33, David Wang, ITW, Standard Operation, TM1, Nb#7, TM1connected in ITW 
TM 1 is in ITW now. All connections are done. The turbo pumps had been started  this afternoon. The vacuum looks good so far. The water interlock check
which  related to TM1 are done. They are good. All TM1 water signals are visually  checked and they are strong.  The rest interlock check ( MCR
XT page) will be  finished before shielding blocks moving. The MAA is locked and ITE is ready for  proton beam.        
Entry  Tuesday, September 25, 2012, 10:34, Travis Cave, ITW, Standard Operation, TM1, Nb#7, module move 
TM#1 with Nb#7 moved from the conditioning station to the west target station. Move went well.
Entry  Thursday, September 20, 2012, 09:16, David Wang, Conditioning Station, Standard Operation, TM1, Nb#7, TM1 Nb#7 target heat shield helium pressure check is done. 
Leak detector pumped down to base LR1.3xE-9 atm.cc/sec, and BP 8xE-3 torr. All  high vacuum gauge readings at CS and TM1 are at low -6 range from 1.2xE-6torr
to 4.6x E-6 torr. Applied 80 psi helium  to heat shield  circuit for 5minutes and there is no any response on leak detector. The  heat shield circuit
is leak tight.
Entry  Thursday, September 20, 2012, 08:45, Travis Cave, Conditioning Station, Standard Operation, TM1, Nb#7, Electrical check TM1_Nb7_Elec_chk_CS.PDF
Electrical check was done at the conditioning station this morning results are on the attached PDF.
Entry  Wednesday, September 19, 2012, 11:24, Travis Cave, Conditioning Station, Standard Operation, TM1, Nb#7, module move 
TM#1 with Nb#7 was moved from the south hot cell to the conditioning station. Move went well.
Entry  Wednesday, September 19, 2012, 11:23, Travis Cave, South Hot-Cell, Standard Operation, TM1, Nb#7, Electrical check TM1_Nb7_Elec_chk_SHC.PDF
TM#1 with Nb#7 attached was electrically checked at the south hot cell yesterday, see attached pdf for details. Some notes about this test the oven to
the 60kV common is 2Mohm this was noticed on the target prior to installation on the module, and the 60kV common to chassis is low at 874Mohm (low as in
a non infinite value).
Entry  Tuesday, September 18, 2012, 13:47, chad fisher, South Hot-Cell, Standard Operation, TM1, Nb#7, Nb #7 install Cover Baseline IMG_3191.JPGIMG_3192.JPG
Nb #7 was installed and tested today.
Inside face of the containment box cover was cleaned with methanol and a baseline picture taken in an effort to track deposits and marking as requested
bty Anders.
Entry  Tuesday, September 18, 2012, 13:41, David Wang, South Hot-Cell, Standard Operation, TM1, Nb#7, leak check heat shield circuit 
Chad  and i did a leak check on TM1 heat shield circuit with new Nb#7 target  installed. It took about 5 mins pump down  the circuit to leak rate 0.0x
E-9atm.cc/sec and 0.0x E-4 torr on leak  detector.
All vacuum lines and joints which connected to the leak detector had  been helium sprayed and they are leak  tight. Chad sprayed helium on
Entry  Tuesday, September 18, 2012, 09:13, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 
TM#1 moved from the south west silo to the south hot cell, move went well.
Entry  Friday, September 14, 2012, 10:45, Travis Cave, Spent Target Vault, Standard Operation, , UCx#4, Spent target move Vault_Storage_September_14_2012.pdf
UCx#4 has been moved from the south hot cell to the spent target vault. The target was placed in pail #99 and now resides in spot 3C of the vault. It
measured 55.3mSv/hr at ~1m from the hot cell. See attached PDF for further spent target vault details.
Entry  Thursday, September 13, 2012, 13:27, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 
TM#1 has been moved from the south hot cell to the south west silo. Move went well.
Entry  Thursday, September 13, 2012, 11:03, Travis Cave, South Hot-Cell, Standard Operation, TM1, UCx#4, module move 
TM#1 with UCx#4 has been moved from the west target station to the south hot cell. Move went well.
Entry  Wednesday, September 12, 2012, 11:59, David Wang, ITW, Standard Operation, TM1, UCx, TM1 disconnected in ITW 
I removed 5 shielding blocks from ITW to block storage area, and disconnected TM1 in ITW. After UCx run,  the radioactive level around the turbo
pumps and primary vacuum lines are pretty high. This affect the general field inside the ITW pit around working area.i took 15 minuts to finish the job
and i got 0.1msvr dose. the general field around my working area is about 350 usv/h.
Entry  Wednesday, September 12, 2012, 07:00, David Wang, ITE, Standard Operation, TM4, NiO #1, ITM4 in ITE connected and pumping down 
TM4 had been connected in ITE. Six turbo pump had been started . thepumpming diwn is very good so far. The water interlock check on ITE and TM4 had been
finished and everything is good.All water signals are strong and constant by visually checking.
Entry  Friday, September 07, 2012, 10:37, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, Electrical check TM#4_NiO#1a.PDF
Electrical check of the TM#4 with NiO#1 was done again today. see attached file for results.
Entry  Friday, September 07, 2012, 09:47, Travis Cave, Spent Target Vault, Standard Operation, , UO#3, Spent target move Vault_Storage_September_6_2012.pdf
The spent UO#3 was moved from the south hot cell to the storage vault. It was in pail 98 and placed in spot 1A of the vault, the field measured upon
removal from the hot cell were 42mSv/hr. See attached PDF for vault details.
Entry  Friday, September 07, 2012, 08:54, David Wang, Conditioning Station, Standard Operation, TM4, NiO #1, TM4 NiO #1 target heat shield helium pressure check is done. 
leak detector pumped down to 0.0xE-9 atm.cc/sec, and 0.0xE-4 torr. All high vacuum gauge readings at CS and TM4 are at low -6 range from 2.2xE-6torr
to 4.2x E-6 torr. Applied 80 psi helium  to heat shield circuit for 5minutes and there is no any response on leak detector. The heat shield circuit
is leak tight.
Entry  Wednesday, September 05, 2012, 14:40, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, Electrical check TM#4_NiO#1.PDF
See attached PDF for details. 60kV Common to the target is low at 343k but I've been told will work. Test will be done again on Friday after it has sat
a few days under vacuum.
Entry  Wednesday, September 05, 2012, 14:36, chad fisher, South Hot-Cell, Standard Operation, TM4, NiO #1, UOx removal NiO installation 
UOx was removed from TM4 yesterday and NiO#1 installed.
Video was taken.
Main stand-off insulators continue to deteriorate.
Entry  Wednesday, September 05, 2012, 11:55, Travis Cave, Conditioning Station, Standard Operation, TM4, NiO#1, module move 
TM#4 with NiO#1 has been moved from the south hot cell to the conditioning station. Move went well.