Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 225     Entry time: Wednesday, January 02, 2013, 12:11
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM1 
Target/Number:  
Subject: I moved 5 shielding blocks from ITW to block storage area 

I moved 5 shielding blocks from ITW  to block storage area for preparing the TM1 disconnection. Air sampled and swiped blocks and ITW and everything is fine.Fiona was with me all the time during the moving.

ELOG V2.9.2-2455