Wednesday, February 10, 2021, 11:34, David Wang, Assembly/Bench Test, Standard Operation, , , Old resin can and 2A window RH clamp field measurement at silo.
|
Old resin can: 0.5 meter 360 degree rotation above silo area, 350u sv/hr. On contact 3.0 to 3.5 msv/hr. It was replaced
during 2017 winter shut down, and stored in silo since then.
2a window RH clamp: 0.5 meter, 160 usv/hr. On contact, hottest spot 3.5msv/hr, general,1.8 msv/hr. |
Wednesday, February 10, 2021, 13:30, David Wang, Safe Module Parking, Standard Operation, , , TM2 and TM4 electrical check without targets.
|
TM2 at SMP under vacuum. TM4 at silo. Frank and I did the tests. Everything is fine on TM4 check. On TM2, all mega test at 500V
are around 200K ohms which is so abnormal. We will move TM2 to TCS and start investigation there. |
Friday, February 12, 2021, 07:07, David Wang, ITE, Maintenance, , , ITW and ITE clean up.
|
Vacuum cleaned ITW and ITE station. |
Tuesday, February 16, 2021, 14:00, Adam Newsome, Crane, Development, , , Crane pendant upgrade
|
The crane pendant for the main hoist was upgraded to a FLEX EX2 style pendant by Canco Cranes. The installation work was performed by Matt at Canco,
supervised by Tom Kauss, David Wang, and Adam Newsome. Installation work was performed in two phases since the initial installation did not provide adequate
range and an antenna issue needed to be resolved (I2021-01-14-1, |
Thursday, February 18, 2021, 12:33, David Wang, ITE, Repair, , , ITE:TP1S
|
ITE TP1S new pump is installed today. Reset pump life time on controller to 0 hr. |
Thursday, February 18, 2021, 12:59, David Wang, Assembly/Bench Test, Maintenance, , , TM3 source tray and old resin can storage in lower cyclotron basement
|
TM3 old source tray, old target hall high active water resin tank, and old 2A window RH clamp are transferred from TH to cyclotron lower vault
basement 10 and 10A location for storage. They are placed beside and in front of old TM1 and TM2 source tray boxes which stored there in 2018. |
Tuesday, February 23, 2021, 09:00, David Wang, Assembly/Bench Test, Maintenance, , , target staion vacuum pumps inspection.
|
Edi and I inspected roughing pump ITM MP1, primary backup pump ITHMP1, and secondary backup pump ITHMP2. We checked oil level and color on all pumps.
Refilled lubricant to ITMMP1. ITHMP1 and MP2 oil level is fine. ITH MP1 oil color is darker than MP2. But, both them are ok still. Shielding block has
been restored after the job. |
Thursday, February 25, 2021, 10:09, Frank Song, ITE, Repair, , , Disconnect Entrance Module in ITE
|
David and I disconnected entrance module in ITE by following the procedure # 190510. And, the yoke was installed and left on for remote handling
later. |
Tuesday, March 02, 2021, 08:12, David Wang, Conditioning Station, Standard Operation, , , TCS leak check.
|
TCS leak check: TCS IG1S1.6 XE- 6 torr. LD 0.0XE-9atm.cc/sec.We used a long pole to spray helium to TCS vacuum seals on diagnostic box and vessel
body. Lots helium have been sprayed around the check area. no leak has been found. |
Thursday, March 04, 2021, 11:20, David Wang, ITW, Maintenance, , , ITW water flow wheels and coils replacement.
|
ITW water flow wheels and coils are replaced. Wheels and coils on Oven, Tube, HS, EE, MSP, Febiad coil, containment box window, dump,dump plug, 2A window,
and tank return circuits are replaced with new parts. |
Thursday, March 04, 2021, 16:30, Isaac Earle, North Hot-Cell, Development, , , NHC gas delivery lines leak checked
|
The North Hot Cell gas delivery lines (labeled 1, 2, and 3 on the hot and cold side panels) were leak checked today. 5psi helium gas was
applied to each line in turn with the appropriate solenoid valve opened and a Staubli connector with plastic tubing and the leak check wand attached to
the matching connector inside the cell. The end of the wand was sealed using tape. The Agilent G8601 leak detector was used on "sniffing" |
Thursday, March 11, 2021, 11:42, Frank Song, ITE, Maintenance, , , ITE water flow wheels and coils replacement.
|
ITE water flow wheels and coils are replaced. Wheels and coils on Oven, Tube, HS, EE, MSP,
Febiad coil, containment box window, dump, dump plug, 2A window, and tank return circuits are replaced with new parts. |
Friday, March 12, 2021, 11:36, Travis Cave, South Hot-Cell, Maintenance, , East Entrance Module, Entrance module move
|
The East Entrance Module has been moved from the East Target Station to the South Hot Cell. |
Monday, March 15, 2021, 13:01, Isaac Earle, Crane, Development, , , Plate & pin lift assembly load testing (ITA6550) 11x
|
In mid-2020 design analysis was completed on the steel plate & pin assemblies (ITA6550) used to connect the ISAC target hall crane hook block to
the module lifting yoke assembly ITA0494. The released design note is Document-184431.
In November 2020 fabrication was completed on two full plate & pin assemblies (photos attached below). As per the relevant ASME standards |
Wednesday, March 17, 2021, 09:10, Travis Cave, ITE, Standard Operation, , , Entrance module move
|
The east entrance module is now back at the east target station. |
Wednesday, March 17, 2021, 11:43, Frank Song, ITE, Repair, , , Re-connect Entrance Module in ITE
|
David and I re-connect Entrance module at ITE after the monitor been replaced at SHC. |
Thursday, March 25, 2021, 08:55, Anders Mjos, Conditioning Station, Maintenance, , , Filters inspected and cleaned on water circuit
|
By Curtis. See Work Permit I2021-03-24-1 for details. |
Thursday, March 25, 2021, 10:38, David Wang, Spent Target Vault, Standard Operation, , C#1, Remove pail 237 spent target C#1 from storage vault to mini storage.
|
Pail 237 only has 200u sv/hr field at 0.5 meter. On contact measurement: 0.9 to 1.6 m sv/hr.and less than 80 count contamination outside the pail.
It is moved to mini storage. We will transfer this pail to cyclotron vault and store it there later. |
Friday, March 26, 2021, 12:22, Adam Newsome, Crane, Development, , , Aux Hoist Pendant Upgrade
|
The crane pendant for the auxiliary hoist was upgraded to a FLEX EX2 style pendant by Canco Cranes. The installation work was performed by Canco, supervised
by Tom Kauss and David Wang. Installation work was performed in one day (I2021-03-26-1).
Items installed include: new pendant (2 motion, 2 speed) |
Monday, April 12, 2021, 13:45, Anders Mjos, Cooling, Maintenance, , , New T installed for instrumentation loop on HALCW system
|
Adrian and co installed a new T to be able to add an instrument loop for O2 and pH monitoring on the low conductivity water systtem (photo). See WP I2021-04-09-4
|
|