Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2186     Entry time: Wednesday, February 10, 2021, 13:30
Author: David Wang 
Category: Safe Module Parking 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: TM2 and TM4 electrical check without targets. 

 TM2 at SMP under vacuum. TM4 at silo.  Frank and I did the tests. Everything is fine on TM4 check.  On TM2,  all mega test at 500V are around 200K ohms which is so abnormal. We will move TM2 to TCS and  start investigation there.

Attachment 1: TM2_and_TM4_electrical_check_without_target.pdf  470 kB  | Show | Hide all
ELOG V2.9.2-2455