Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2182     Entry time: Monday, January 25, 2021, 12:33
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: ITW bias HV test 

Ramp up ITW bias to 57KV. no spark. 200uA leaking current at 57KV. The test is done without target module in station.   ITW water circuits are looped in pit.  EE , EL are switched off during the test. 

ELOG V2.9.2-2455