Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2136     Entry time: Monday, August 24, 2020, 10:11
Author: Adam Newsome 
Category: ITW 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Entrance Module to ITW 

Entrance Module was moved from South Hot Cell to ITW Station.

Note: weight of entrance module, as shown via overhead crane's load cell, is 14,900 lbs.

ELOG V2.9.2-2455