Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2183     Entry time: Wednesday, January 27, 2021, 14:30
Author: David Wang 
Category: Cooling 
Type: Development 
Module:  
Target/Number:  
Subject: High active water system purging 

High active water are purged to holding tank at B2  level. There should be around 48 gallons are purged out of system. No purging on dump circuits on both ITW/ ITE.

ELOG V2.9.2-2455