ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  822   Monday, December 15, 2014, 13:25 Anders MjosConditioning StationMaintenanceTM2 BIASSW1 temperature and flow removed from interlock chain

    

       
            
  
  824   Tuesday, December 23, 2014, 14:10 Anders MjosConditioning StationDevelopmentTM2 He leak check of the Service Cap using RGAThe RGA showed no response to He-spray
on the Service Cap. He stable at 3.5E-9 T
partial pressure, water at 1.3E-6 T. IG1
  
  825   Monday, January 05, 2015, 12:47 Anders MjosConditioning StationDevelopmentTM2 Cooling package started by "enable staging" button.
MP3 has to be turned off-on to open WPV1
  
  826   Monday, January 05, 2015, 15:01 Anders MjosConditioning StationDevelopmentTM2 RGA switched on    
  828   Tuesday, January 06, 2015, 11:21 Anders MjosConditioning StationDevelopmentTM2 He leak check of cooling circuits.No leak detected on either He-detector
(connected directly to Service Cap) or on
RGA. See attached screen shots.
 2015-01-06_He_leak_check_water_circuits.pdf 
  829   Wednesday, January 07, 2015, 09:31 Anders MjosConditioning StationDevelopmentTM2 High Voltage ConditioningNo Source Tray installed. Loop on cooling
circuit D. All other circuits blanked off.
Voltages stated below are set point
  
  832   Thursday, January 08, 2015, 15:24 Anders MjosConditioning StationDevelopmentTM2 Fault 2 on chiller unit Found both VFDs with OF3 fault (over
voltage during constant speed operation).
Thursday, January 08, 2015, 16:37:
 Capture.PNGVFD_Fault.jpg 
  836   Wednesday, January 28, 2015, 10:42 Anders MjosConditioning StationMaintenanceTM2 TCS shut down for site wide power outage    
  845   Tuesday, February 17, 2015, 13:06 Anders MjosITEDevelopment  Resistance measured of TGHT and TBHT lines to ITEThe copper bars was installed by David
and Anders. After the measurements were completed,
the copper bars were removed.
 002.JPGResistance_from_Electrical_Room_to_Target_Station.xlsx 
  846   Tuesday, February 17, 2015, 13:07 Anders MjosITWDevelopment  Resistance measured of TGHT and TBHT lines to ITW See e-log entry
for ITE for details. The copper bars have
not been removed. They can be used for testing
  
  860   Thursday, March 12, 2015, 13:33 Anders MjosSouth Hot-CellStandard OperationTM1ThO#1Target inspectionChad, Anders and Alex inspected the target
this morning. The target had no significant
visible damage to the container. Some material
  
  878   Monday, March 30, 2015, 09:03 Anders MjosConditioning StationStandard OperationTM4Ta#45Ta#45 ConditionoingMonday, March 30, 2015, 08:59: Reset chiller
by switching on off power (fault 2)
Monday, March 30, 2015, 09:02: Switched
 Ta#45_Conditioning.docx 
  886   Wednesday, April 15, 2015, 09:01 Anders MjosConditioning StationDevelopment  Archiver variables added by Controls 
 
 
  
  891   Monday, April 20, 2015, 10:12 Anders MjosConditioning StationStandard OperationTM1UC#12Conditioning UC#12Monday, April 20, 2015, 09:35: Started
cooling water circulation
HV cover did not fit due to interference
  
  897   Thursday, April 23, 2015, 12:56 Anders MjosConditioning StationMaintenanceTM1 IG1 Good Vacuum limit changedChanged by Dave Morris. 
New value is 1E-5 T (old value was
7.09E-5 T)
 IG1GoodVacuum.png 
  903   Tuesday, April 28, 2015, 11:09 Anders MjosITWMaintenance  Resistance measured of TGHT and TBHT lines to ITWThe new TBHT and TGHT power supplies were
brough up to high current; 350 A and 420
A respectively. The TGHT power supply was
 Resistance_from_Electrical_Room_to_Target_Station.xlsx 
  909   Monday, May 04, 2015, 13:32 Anders MjosConditioning StationMaintenance  TK2 expansion tank topped upCaled cyclotron ops to open P23 and confirmed
penthouse valve open.
Filled up TK2 to 21 in water leve.
  
  913   Monday, May 11, 2015, 10:45 Anders MjosConditioning StationMaintenance  RGA electronics box installed The communications chip has been
replaced. The electronics box has been grounded
(see attached pdf).
 2015-05_RGA_GND_connection.pdf 
  931   Wednesday, June 03, 2015, 13:01 Anders MjosConditioning StationStandard OperationTM4SiC#31Conditioning SiC#31PNG1 connected to PNG in service cap
(as per David W)
 Wednesday, June 03, 2015, 12:59:
 SiC#31_Conditioning.docx 
  959   Tuesday, June 23, 2015, 16:49 Anders MjosConditioning StationDevelopment  TCS is beeing migrated to ISACby controls group (Dave Morris).

Friday, June 26, 2015
TCS has been migrated to ISAC controls.
  