Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 909     Entry time: Monday, May 04, 2015, 13:32
Author: Anders Mjos 
Category: Conditioning Station 
Type: Maintenance 
Module:  
Target/Number:  
Subject: TK2 expansion tank topped up 

Caled cyclotron ops to open P23 and confirmed penthouse valve open.

Filled up TK2 to 21 in water leve.

ELOG V2.9.2-2455