Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 845     Entry time: Tuesday, February 17, 2015, 13:06
Author: Anders Mjos 
Category: ITE 
Type: Development 
Module:  
Target/Number:  
Subject: Resistance measured of TGHT and TBHT lines to ITE 

The copper bars was installed by David and Anders. After the measurements were completed, the copper bars were removed.

See photo and attached spread sheet.

Attachment 1: 002.JPG  3.544 MB  | Show | Hide all
Attachment 2: Resistance_from_Electrical_Room_to_Target_Station.xlsx  21 kB  Uploaded Tuesday, February 17, 2015, 15:14
ELOG V2.9.2-2455