Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 913     Entry time: Monday, May 11, 2015, 10:45
Author: Anders Mjos 
Category: Conditioning Station 
Type: Maintenance 
Module:  
Target/Number:  
Subject: RGA electronics box installed 

 The communications chip has been replaced. The electronics box has been grounded (see attached pdf).

Attachment 1: 2015-05_RGA_GND_connection.pdf  177 kB  Uploaded Monday, May 11, 2015, 12:47  | Show | Hide all
ELOG V2.9.2-2455