Tuesday, August 09, 2022, 12:23, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #64, Electrical Check for TM4 with Ta#64 after beam at NHC
|
An electrical check made at NHC right after TM4 moving from ITE. |
Friday, April 07, 2017, 09:53, Travis Cave, Conditioning Station, Maintenance, TM1, no target, Electrical Check and TM1 other checks
|
Results of an electrical check on TM#1 with no target attached to it.
I use this e-log entry for TM1 notes as well 1. TM1 IG1 is a dual filament gauge . Its filament is very close to grid now. It shorted one time during the pumping down. It still works fine so far . But, we may need to change it if we use this module in TS again.
TCS 1G1 and 1G1S are pumped to 5Xe-6 torr. IG2 stayed at 2.5XE-5 torr. Since no target is installed on module , I capped top of HS water line. Maybe, the small o-ring seal in cap is too old, I found a big leak on this seal when i use LD check it. That is the reason IG2 stayed too high. Still, Leak check and helium presuure test are fulfilled on TM1. Leak detector BLR 5XE-7 atm.cc/sec, BP 0.0XE-4 torr9. Back up pressure is 51 mtorr which is high because of leak on HS line cap seal so LD BLR is high. At this level, Ta+-, Tube +-, MSP, EE are good. Other air to vacuum seal are good as well at this leak rate. I will check and change small o-ring seal in HS cap. The TM1 is functional basically. |
Friday, June 08, 2012, 15:00, Don Jackson, South Hot-Cell, Standard Operation, TM1, Nb#6, Electrical Check Nb#6 at end of run
|
Megger check values were low but still within operational range. |
Tuesday, July 21, 2015, 09:21, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check Failed
|
TM#2 has failed the electrical check see attached pdf for details. |
Monday, June 01, 2015, 14:24, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#45, Electrical Check
|
Post beam electrical check on the Ta#45 target installed on TM#4. See attached PDF. |
Tuesday, June 02, 2015, 10:39, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#31, Electrical Check
|
Electrical check on TM#4 with SiC#31. See attached PDF for details. |
Wednesday, July 22, 2015, 11:31, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Electrical Check
|
Electrical check done on TM#2 around the 25th of June 2015, this was before the coil line leak was found. |
Monday, July 27, 2015, 12:12, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#31, Electrical Check
|
Electrical check of TM#4 post beam with target (SiC#31) on and module without target on. There is a short between the target and EE when the target is on and when the target was removed short went away. See the PDF for details. |
Monday, July 27, 2015, 13:38, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#13, Electrical Check
|
Electrical check of TM#4 with UC#13 at the south hot cell. See PDF for details. |
Tuesday, July 28, 2015, 14:31, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#13, Electrical Check
|
TM#4 with UC#13 electrical check at the conditioning station under vacuum. See attached PDF. |
Thursday, August 13, 2015, 11:34, Travis Cave, South Hot-Cell, Standard Operation, TM2, Dummy Target, Electrical Check
|
Electrical check of TM2 without target after that widget has installed, electrical check with the shunts on, electrical check with the dummy target installed. |
Thursday, August 20, 2015, 11:00, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Electrical Check
|
TM#2 electrical check at the conditioning station. All pumps were off but the module was not vented. |
Wednesday, August 26, 2015, 09:20, Travis Cave, South Hot-Cell, Standard Operation, TM2, ZrC #7, Electrical Check
|
Electrical check of TM#2 with ZrC #7 installed |
Thursday, August 27, 2015, 08:43, Travis Cave, Conditioning Station, Standard Operation, TM2, ZrC #7, Electrical Check
|
Electrical check of TM#2 at the conditioning station under vacuum. The resistance value of the target to 60kV common is a bit lower then what it was at the south hot cell. |
Tuesday, September 22, 2015, 11:35, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#13, Electrical Check
|
TM#4 with UC#13 post beam electrical check. Also and electrical check was done without the target on. |
Tuesday, September 22, 2015, 11:39, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#46, Electrical Check
|
TM#4 electrical check with Ta#46 attached. |
Wednesday, September 23, 2015, 13:56, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#46, Electrical Check
|
TM#4 electrical check at the conditioning station with Ta#46 target. |
Wednesday, September 30, 2015, 11:14, Travis Cave, South Hot-Cell, Repair, TM3, no target, Electrical Check
|
TM#3 electrical check at the south hot cell, no target, all value are done at 1000Volts. See the attached PDF for the results. |
Friday, March 18, 2016, 13:13, Travis Cave, Conditioning Station, Standard Operation, TM2, SiC#32, Electrical Check
|
Electrical checks of the TM#2 with the old SiC#32 and without the target. See attached PDFs. |
Wednesday, March 30, 2016, 11:00, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Electrical Check
|
The results of the TM#1 electrical check from the 29th of March 2016 |
|