Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 406     Entry time: Tuesday, July 23, 2013, 13:33
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#40 
Subject: Electrical check 

Results of electrical check on Ta#40 target on TM#4 post beam at the south hot cell

Attachment 1: TM#4_Ta#40_SIS_Tgt_Elec_Chk_post.PDF  248 kB  | Show | Hide all
ELOG V2.9.2-2455