Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 291     Entry time: Monday, April 08, 2013, 12:10
Author: Travis Cave 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM1 
Target/Number: Ta#39 
Subject: Electrical check 

TM#1 with Ta#39 had the electrical check done on it again it passed, changes this time were the water lines were purged and it was under a better then roughing vacuum. See the attached pdf for details.

Attachment 1: TM1_Ta39_CS_ELEC_CHK2.PDF  195 kB  | Show | Hide all
ELOG V2.9.2-2455