Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 293     Entry time: Tuesday, April 09, 2013, 09:06
Author: Travis Cave 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM1 
Target/Number: Ta#39 
Subject: Electrical check 

TM#1 with Ta#39 has not passed it electrical check again, while sitting at the conditioning station at air. The readings have not been consistant. See the current PDF for details.

 

TM#1 with Ta#39 electrical check at the target station see attached PDF (CHK 4).(April 9th 2013) PASSED

TM#1 with Ta#39 electrical check at the target station see attached PDF (CHK 5).(April 10th 2013) PASSED

Attachment 1: TM1_Ta39_CS_ELEC_CHK3.PDF  198 kB  | Show | Hide all
Attachment 2: TM1_Ta39_CS_ELEC_CHK4.PDF  197 kB  Uploaded Tuesday, April 09, 2013, 14:57  | Show | Hide all
Attachment 3: TM1_Ta39_CS_ELEC_CHK5.PDF  197 kB  Uploaded Wednesday, April 10, 2013, 10:01  | Show | Hide all
ELOG V2.9.2-2455