ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
480
|
Monday, September 30, 2013, 16:00 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check |
|
|
483
|
Tuesday, October 01, 2013, 10:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check | TM#4 with SiC#29 electrical check post
beam see pdf for details. |
|
484
|
Tuesday, October 01, 2013, 11:00 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | NiO#2 | Electrical check | TM#3 with NiO#2 electrical check at conditioning
station under vacuum, see pdf for details. |
|
487
|
Wednesday, October 02, 2013, 14:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check | Electrical check done on TM#4 with no target,
see PDF. |
|
512
|
Friday, October 18, 2013, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check | With the coil line removed an electrical
check was done on TM#4 at the South Hot Cell
see attached pdf. |
|
570
|
Wednesday, December 04, 2013, 14:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Electrical check | Electrical check of TM#4 with Ta#41 post
beam at the south hot cell. See PDF for details |
|
572
|
Thursday, December 05, 2013, 12:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#8 and no target | Electrical check | Electrical check was done on TM#4 without
a target and with the UC#8 target on see
attached PDF for results. |
 |
631
|
Tuesday, March 25, 2014, 13:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Electrical check | TM#4 was checked electrically with and
without target on it, see attached PDFs for
details. |
 |
634
|
Thursday, March 27, 2014, 10:47 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#42 | Electrical check | TM#4 with Ta#42 in the conditioning station
under vacuum electrical check. |
|
640
|
Monday, April 07, 2014, 10:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check | TM#3 electrical check at the south hot
cell with no target to give us a base line
and show that things are ok with the module |
|
641
|
Monday, April 07, 2014, 11:49 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Electrical check | Electrical test of TM#3 with TiC#4 attached.
See PDF. |
|
667
|
Tuesday, May 27, 2014, 11:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Electrical check | TM#4 electrical check with Ta#42 attached
post beam at the south hot cell. |
|
672
|
Monday, June 02, 2014, 11:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check | TM#1 with UC#9 electrical check see attached
pdf for details. |
|
686
|
Tuesday, June 24, 2014, 11:58 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Electrical check | Electrical check of the TiC#4 on TM#3 post
beam at the south hot cell, see attached
PDF for details |
|
691
|
Wednesday, June 25, 2014, 13:46 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Electrical check | Electrical check of TM#3 after the insulator
repair. See attached PDF for details. |
|
693
|
Thursday, June 26, 2014, 11:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | SiC#30 | Electrical check | Electrical check of the TM#3 with SiC#30
attached. Also an electrical check of TM#3
after the cleaning of ground electrode with |
 |
703
|
Wednesday, July 16, 2014, 13:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check | Electrical check of the TM#1 with UC#9
post beam at the south hot cell. |
|
706
|
Wednesday, July 16, 2014, 14:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | Electrical check | TM#1 with Ta#43 electrical check see attached
PDF. |
|
730
|
Monday, August 11, 2014, 10:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | Electrical check | Electrical check of TM#4 with UC#10 from
thursday. |
|
737
|
Wednesday, September 03, 2014, 13:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check | TM#1 with ZrC#6 electrical check at the
south hot cell. The conductance of target
on circuit A-D is a little lower then normal. |
|