|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
471
|
Thursday, September 26, 2013, 14:47 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | NiO#2 | Water pumps turned on | The water pumps for the conditioning
station were turned on at ~11:45. It took
longer to start the conditioning station |
|
|
472
|
Thursday, September 26, 2013, 14:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HV conditioning | The first attempt at HV conditioning
of TM3 with the new source tray and NiO#2
target installed. Conditioning so far has |
|
|
473
|
Thursday, September 26, 2013, 15:00 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | RGA not connecting | Following the helium pressure test
Don attempted to connect to the RGA via the
network. He was unable to do so. This scan |
|
|
474
|
Thursday, September 26, 2013, 15:25 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HV conditioning |
|
|
|
476
|
Friday, September 27, 2013, 12:53 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HP TGHT and TBHT conditioning | Yesterday TM3 had the TGHT current
raised to 160 amps and the TBHT raised to
200 amps. At this power the TGHT showed typical |
|
|
479
|
Monday, September 30, 2013, 15:59 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Module move from SW Silo to SHC | TM4 was move by myself and Grant.
Move went smoothly, no hang ups. |
|
|
480
|
Monday, September 30, 2013, 16:00 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check |
|
|
|
481
|
Monday, September 30, 2013, 16:02 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | Vacuum | The roughing pump for TCS was started
at ~3:00 and the turbo's turned on at ~4:00.
This is the minimum time for the module to |
|
|
482
|
Monday, September 30, 2013, 16:04 |
Bevan Moss | Conditioning Station | Repair | TM3 | NiO#2 | Ion gauge filament replacement | The filament on IG1 for TM3 was replaced
by myself and Edi. The old filament did not
appear to be damaged but the controller claimed |
|
|
485
|
Wednesday, October 02, 2013, 09:40 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | HP conditioning | Yesterday the TBHT was ramped to 250 amp
and the TGHT was ramped to 440 amps. Attached
is the data from that run the strip tool |
|
|
486
|
Wednesday, October 02, 2013, 13:44 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | | Right Coil is leaking | Today Maico and Travis completed
and electrical test to determine the right
and left coil on TM4. The left coil is the |
|
|
502
|
Tuesday, October 15, 2013, 15:34 |
Bevan Moss | ITE | Standard Operation | TM3 | | Blocks moved from ITW to ITE | Blocks 1-4 have been moved from ITW
to ITE. Block 5 was moved to a storage area
as it will be in the way of the harp repair. |
|
|
508
|
Friday, October 18, 2013, 10:17 |
Bevan Moss | ITW | Repair | | | Paddle Wheel | Yesterday I visually inspected the
paddle wheel and noticed that it was spinning
freely and constant. As the signal was intermittent |
|
|
510
|
Friday, October 18, 2013, 14:33 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | | Module move | TM4 without a source tray was moved
from the SHC to the TCS. All went well. |
|
|
511
|
Friday, October 18, 2013, 14:37 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Roughing Started | The roughing pump has been started. |
|
|
513
|
Friday, October 18, 2013, 15:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Turbo Pumps are on | The Turbo pumps are now running on
TCS |
|
|
514
|
Monday, October 21, 2013, 10:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Cooling On and Electrical Connections Made | The electrical connection have been
made and cooling package was started at ~10:50am
today |
|
|
515
|
Monday, October 21, 2013, 12:29 |
Bevan Moss | Conditioning Station | Repair | TM4 | | BIAS Canbus | There is something wrong with the
BIAS canbus controller. It says that it is
not alive and has timed out. I have tried |
|
|
518
|
Tuesday, October 22, 2013, 16:52 |
Bevan Moss | Conditioning Station | Repair | | | Canbus base card for BIAS | The base card in the canbus BIAS
module was determined to be faulty. Dave
Morris removed a card VECC to repair the |
|
|
519
|
Tuesday, October 22, 2013, 17:04 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | HV testing | This afternoon TM4 with the coil
removed was tested with HV. The EINZEL LENS
was first tested independently while the |
|