Entry time: Monday, May 06, 2013, 15:45
|
Author: |
Bevan Moss |
Category: |
Conditioning Station |
Type: |
Repair |
Module: |
TM3 |
Target/Number: |
|
Subject: |
55 pin connector removed |
|
|
Travis and I removed the 55 pin connector from the service cap today. The feed through was left in place as a new design for the replacement has yet to be designed. It was not possible to test if the cables could be pulled easily as I believe there is still 1 cable tie in the containment box. The wires were cut flush with the top of the copper tube in case Chad cannot remove them via the hot cell. Other items removed include several cable ties and a clamp used to hold a cable tie. The side panels on the service cap we difficult to remove so copper never sieze was added when they were re-installed. I have attached some pictures from before and after a complete record can be found in the TM3 docushare folder. |
|
|
|
|