Message ID: 315     Entry time: Tuesday, April 23, 2013, 15:52
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM3 
Target/Number: N/A 
Subject: Further HV Testing 

 Further HV testing was completed today from ~2:00 until 3:00. The resistivity of the water was 11.7 - 12.7 Mohm. The EE was turned on to 1500 V and had a leakage current of 1.465 mA with a inline and ballast resister of 20 kohm and 1 Mohm respectively. In addition to this all of the CB were turned on to 500V. The voltage on the source tray with all bias items tied together and the voltage was then raised to 30kV in 5kV steps. It was then raised until 37kV in 1kV step at which point the first spark was detected. Steps were then reduced to 500V until 39.5kV was achieved. Sparking was noticed when stepping up from one voltage to the next and steps were reduced to 100V. At 39.7 kV there were several sparks and the voltage was held for 8 minutes until there had been at least 4 minutes since the last spark. Voltage was increased to 41.2 kV at 292.97 uA when a spark caused the HVCLTBHT paddle wheel flow sensor to trip. Flow was affected but the interlock was tripped due to noise and as a result the BIAS and EE voltage dropped to zero. At this point the required data had been collected and it was decided to shut the station down. RGA scans were taken during the test and are attached. The edited data with graphs is attached in the excel folder. PNG1 was not monitored as it has failed.

 

The rga application is available at
http://www.thinksrs.com/downloads/soft.htm

 

 

 

Attachment 1: TM3_BIAS_EE_CB_23042013.xlsx  521 kB
Attachment 2: TM3_BIA_EE_CD_23042013_RGA_files.zip  85 kB