Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 318     Entry time: Wednesday, April 24, 2013, 09:00
Author: Bevan Moss 
Category: Conditioning Station 
Type: Development 
Module:  
Target/Number:  
Subject: New user testing 

 Controls has created a new user group that can operate the conditioning station but cannot use any of the bypasses or forces. The cooling package will be used to test this new profile. The main loop bypass has been opened to allow this testing to happen without the risk of over pressure.

ELOG V2.9.2-2455